Laserfiche WebLink
<br /> REPORTER'S TRANSCRIPT OF'PROCEEDINGS TAKEN 6-7-04 <br /> 1 that they had made and the possible ramifications <br />( 2 of it. Reading it over I spoke with our City <br /> 3 Manager about the recommendation that the developer <br /> 4 submit a set of final building plans for each <br /> 5 construction phase of the project to review <br /> 6 architectural and design elements, and I understand <br /> 7 it was to ensure safety, but I also was concerned <br /> 8 about duplicating services as Redwood City would be <br /> 9 doing the same thing, actually. <br /> 10 And staff took this under consideration, <br /> 11 and I was really pleased to see that their revision <br /> 12 said that they're going to recommend that the scope <br /> 13 be limited to true safety items, that their <br />I. <br /> 14 recommendations are advisory only, and that the <br /> 15 City actually has the final say as far as going <br /> 16 over architectural and design elements of the <br /> 17 project. <br /> 18 And I think that in fairness, there's going <br /> 19 to be so many steps along the way that <br /> 20 Glenborough-Pauls needs to go through, I felt that <br /> 21 streamlining that particular part was helpful. <br /> 22 So I wanted to thank staff for doing that <br /> 23 for us. <br /> 24 That's if we vote on that particular <br /> 25 portion, but the recommendation is to vote on that <br /> UCCELLI & ASSOCIATES 26 <br /> (650) 952-0774 <br /> .. <br />