My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 American Pavement Systems, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 American Pavement Systems, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 10:43:10 AM
Creation date
9/2/2015 10:41:56 AM
Metadata
Fields
Template:
Agreement
Contractor Name
American Pavement Systems, Inc.
PROJECT NAME
2014-2015 Asphalt Rubber Chip Seal abd Spot Repair
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� , <br /> administration expenses (including project management and consultants' <br /> expenses), delay and loss of public use, if the Work is not completed within <br /> the time specified in paragraph III.A.1 above plus any extensions thereof <br /> allowed in accordance with the Contract documents. Consistent with Section <br /> 00700 (General Conditions), Contractor and City agree that because of the <br /> nature of the Project, it would be impractical or extremely difficult to fix the <br /> amount of actual damages incurred by City because of a delay in completion <br /> of the Work. <br /> 2. Accordingly, City and Contractor agree that Contractor shall pay City$500 for <br /> each Day that expires after the time specified in Paragraph III.A.1 of this <br /> Section 00520 for Contractor to achieve Substantial Completion, until such <br /> date as contractor achieves Substantial Completion. <br /> C. Liquidated damages for delay shall only cover and be in lieu of the actual damages <br /> suffered by City as a result of delay referenced above. Liquidated damages shall not <br /> cover the cost of completion of the Work, damages resulting from defective work, cost <br /> of temporary replacement facilities, damages suffered by others who then seek to <br /> recover their damages from City (for example, delay claims of other contractors or <br /> subcontractors), and defense costs thereof. <br /> IV. CITY'S ENGINEER AND REPRESENTATIVES <br /> Reserved <br /> V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> In order to induce City to enter into this Agreement, Contractor makes the following <br /> representations and warranties: <br /> A. Contractor has visited the Site and has examined thoroughly and understood the <br /> nature and extent of the Work, Site, locality, actual conditions, as built conditions, and <br /> all local conditions and federal, state and local laws and regulations that in any <br /> manner may affect cost, progress, performance or furnishing of Work or which relate <br /> to any aspect of the design and the means, methods, techniques, sequences or <br /> procedures of construction to be employed by Contractor and safety precautions and <br /> programs incident thereto. <br /> B. Contractor has examined thoroughly and understood all reports of exploration and <br /> tests of subsurface conditions, drawings or reports, available for design and <br /> construction purposes, of physical conditions, or which may be apparent at the Site <br /> and accepts the determination set forth in these Sections and Section 00700(General <br /> Conditions) of the limited extent of the information contained in these Sections upon <br /> which the Contractor may be entitled to rely. Contractor agrees that except for the <br /> information so identified, Contractor does not and shall not rely on any other <br /> information contained in these Sections. <br /> C. Contractor has considered the physical conditions at or contiguous to the Site or <br /> otherwise which may affect the cost, progress, performance or fumishing of Work, as <br /> Contractor considers necessary for the performance or furnishing of Work at the <br /> Contract Sum, within the Contract Time and in accordance with the other terms and <br /> conditions of Contract documents, including specifically the provisions of the General <br /> Conditions. <br /> AGREEMENT <br /> 2014-2015 ASPHALT RUBBER CHIP SEAL AND SPOT REPAIR PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.