Laserfiche WebLink
255 Shoreline Drive, Suite 200 <br /> Redwood City, CA 94065 <br /> 650/482-3600, Fax 650/482-6399 <br /> ENGINEERS,SURVEYORS,PLANNERS <br /> NARRATIVE DESCRIPTION <br /> TIF-ELIGIBLE IMPROVEMENTS <br /> As part of the 103 Wilson (Jefferson & Franklin) project, the developer will construct <br /> improvements within the public right-of-way on Franklin Street. Certain improvements will be <br /> eligible for funding under the City's Transportation Impact Fee (TIF) program. The <br /> improvements which are eligible for this funding are described below. <br /> I . Bulb-outs at Intersection of Franklin and Wilson Streets <br /> Bulb-outs will be installed on the sidewalk at each of the four corners of the Franklin <br /> and Wilson Intersection. New ADA-compliant curb ramps will be installed at each of <br /> these bulb-outs. The intersection will be re-graded and paved to accommodate the <br /> bulb-outs. In addition, a new curb inlet will be installed at the West corner of the <br /> intersection and connected to the existing Storm Drain in Franklin Street at a new <br /> manhole. This curb inlet is required to create positive drainage at the bulb-out at a <br /> slope acceptable to the City. <br /> II . Franklin Street Sidewalk Replacement at AT&T Frontage <br /> The sidewalk along the Southwest side of Franklin Street will be widened between <br /> Jefferson Avenue and Wilson Street. This widening will require removal and <br /> replacement of sidewalk, curb, and gutter, street lights, and street trees. Existing <br /> utility structures in the sidewalk and street in the area of the reconstructed sidewalk <br /> will need to be adjusted to final grade. The existing traffic signal at the South corner <br /> of the intersection of Franklin Street and Jefferson Avenue will be relocated to <br /> facilitate construction of an ADA-curb ramp. An existing gas line is located in Franklin <br /> Street. Widening of the sidewalk will place the gas line within the sidewalk and <br /> potentially in the location of proposed street trees, street lights, and curb inlets. A <br /> relocation of this gas line may be required to facilitate the sidewalk widening. <br /> ATTY/AGR/2015.107/GREYSTAR - 103 WILSON - IA WITH TIF CREDIT page 1669e 21 of 27 <br /> REV: 05-28-15 VR <br />