Laserfiche WebLink
<br /> <br />Red Morton Community Park Sports Lighting Initial Study <br />City of Redwood City 40 June 2015 <br />Standard Measures: The proposed project will implement the following measures to reduce and <br />avoid impacts related to soil and geologic conditions: <br /> <br /> A qualified professional geologist shall complete a design-level geotechnical investigation <br />for the proposed project. The specific design features identified in the geotechnical <br />investigation will be incorporated into the project design. <br /> <br /> The project shall be designed and constructed in accordance with the 2013 California <br />Building Code, which contains regulations that govern the construction of structures in <br />California. Adherence to the 2013 California Building Code will ensure the proposed <br />improvements resist minor earthquakes without damage and major earthquakes without <br />collapse. <br /> <br />4.6.3 Conclusion <br /> <br />With implementation of the standard measures described above, the proposed project would not <br />result in significant geologic or seismic impacts. (Less than Significant Impact) <br /> <br />8.A. - Page 57