My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-09-21 Joint Special SAF PAF
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-09-21 Joint Special SAF PAF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2015 12:12:16 PM
Creation date
9/18/2015 8:41:20 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
756
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the naturally steep condition of the creek, and the volume of water that is carried in the <br />creek — together create a condition of unstopable [sic] erosion. My concern is that these <br />factors should be seriously considered when reviewing the setback from the top of bank." <br />2AR 626.) <br />Interestingly, Respondent's City Engineer did not use the municipal ordinance <br />definition of "top of bank" but rather utilized a manual of guidelines and standards used in <br />Santa Clara County. (2AR 627, 631.) <br />C. Barry Butler of Cornerstone Earth Group provided an expert opinion to <br />Respondent on "top of bank" after reviewing documents and going to look at the subject <br />property. (2AR 620 -622.) Butler states: "[I]t appears that the top of bank designations <br />are in relatively close agreement except for Lots 3 and 4, where the differences generally <br />vary from several feet up to around 10 feet." (2AR 621.) Butler acknowledged the lack <br />of disclosure of what criteria was used by MacLeod for delineating the "top of bank ". <br />2AR 621.) Butler also noted that Respondent was using a measure of 100 -year flood <br />level plus one foot. (2AR 621.) <br />Butler did not utilize the applicable Zoning Ordinance definition of "top of bank" <br />but rather opined that looking at the changes in grade is variable, "there is no clear top of <br />bank transition ", and the Creek bank and where Real Party in Interest claims is the "top of <br />bank" is still below the high flow level of Cordilleras Creek. (2AR 622.) Accordingly, <br />Butler suggests that a &fferent definition and criteria be used to determine "top of bank ", <br />i.e., 100 -year flow elevation plus one foot, and that Butler agrees with the determination <br />made by the City Engineer as to the "top of bank" locations. (2AR 622.) <br />The Zoning Ordinance indicates that if the "top of bank" cannot be determined by <br />distinct changes in grade, "the top of banks shall be as determined by the Engineering and <br />22 <br />8.B. - Page 81
The URL can be used to link to this page
Your browser does not support the video tag.