My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord04 2264
RedwoodCity
>
City Clerk
>
Ordinances
>
2000-2009
>
2004
>
Ord04 2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2012 9:36:15 AM
Creation date
6/29/2004 12:46:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Chapter IV - Implementation <br /> 9. Bair Island Road area bus turn-around minimum, however, 20% of the project's required contributions <br /> for the Blomquist Extension shall be provided prior to Final Map <br /> 10. Blomquist Street Extension and Redwood Creek Bridge approval and the remainder shall be provided not later than Fi- <br /> nal Map approval that includes the SOOth residential unit for the <br /> 11. Pedestrian/bicycle connection under 101 Freeway project. <br /> 12. Blomquist Street/Maple Street Intersection: 2. US 101 Undercrossing, Bayshore Road Widening - A minimum <br /> of twenty percent (20%) of the project's required contributions <br /> a. Install roundabout for the widening of East Bayshore Road and the Hwy. 101 pe- <br /> destrian/bike undercrossing shall also be made prior to Final <br /> b. If installation of a roundabout is not feasible, northbound Map approval for the initial phase of development. The remain- <br /> approach widened to include dedicated left turn lane, a der of funding contributions for roadway improvements shall <br /> shared through/right-turn lane, and initial four-way con- be made prior to the Final Map approval that includes the SOOth <br /> trolled stop to be upgraded to a traffic signal in the future residential unit for the project. <br /> based on significant delay thresholds <br /> 3. Recycled Water Project - Developme~t shall pay connection! <br /> 13. Blomquist Street/Seaport Boulevard Intersection: re-stripe impact fees prior to issuance of building permits for each phase <br /> southbound approach to include dedicated left turn lane, shared of development. <br /> througMeft-tum lane, and dedicated right turn lane. <br /> 4. Off-Site Water Distribution Facilities - Precise Plan Area devel- <br /> 14. East Bayshore Widening: widen from two to three lanes with opment shall provide all facilities needed to serve Precise Plan <br /> improved sidewalks and bicycle lanes. build-out. Plans for these facilities sh~ll be approved by the <br /> City prior to Final Map approval for the initial phase of develop- <br /> Based on City analyses and/or policies, the capital improvements ment. <br /> listed below will need to be provided at early stages of Precise Plan <br /> Area development. Some of these improvements may serve proper- S. Sewage Transmission Facilities - Prior to Final Map approval for <br /> ties outside the Precise Plan Area as well as the Precise Plan Area the initial phase of the project, Precise Plan Area development <br /> itself. Depending upon the type of capital improvement, the City shall provide all funds required for upgrade and expansion of <br /> may establish reimbursement agreements that fairly allocate the peak flow sewage transmission facilities needed to serve Pre- <br /> share of costs to be borne by benefiting parties. cise Plan development and anticipated Bayfront Area and City <br /> demand. <br /> 1. Blomquist Street Extension and Redwood Creek Bridge - The <br /> required contribution to the Blomquist extension and bridge 6. Emergency Off-Site Water Supply Facilities - Prior to occupancy <br /> over Redwood Creek shall be made either prior to Final Map of the initial residential unit for each phase of the project, Pre- <br /> approval for the initial phase of development or when the funds cise Plan Area development shall provide emergency water sup- <br /> are needed by the City to commence project construction. At a ply storage tank(s), land, and/or other associated facilities needed <br /> Final Plan - June 2004 - 80 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.