My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15445
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2015
>
Res15 15445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 2:32:41 PM
Creation date
9/30/2015 10:09:13 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/21/2015 <br /> • All construction equipment shall be maintained and <br /> properly tuned in accordance with manufacturer's <br /> specifications. All equipment shall be checked by a <br /> certified mechanic and determined to be running in proper <br /> condition prior to operation. <br /> • All excavation,grading,and/or demolition activities shall <br /> be suspended when average wind speeds exceed 20 mph. <br /> • Vegetative ground cover(e.g.fast-germinating native <br /> grass seed)shall be planted in disturbed areas as soon as <br /> possible and watered appropriately until vegetation is <br /> established. <br /> • The simultaneous occurrence of excavation,grading,and <br /> ground-disturbing construction activities on the same area <br /> at any one time shall be limited. Activities shall be phased <br /> to reduce the amount of disturbed surfaces at any one <br /> time. <br /> • All trucks and equipment,including their tires,shall be <br /> washed off prior to leaving the site. <br /> • Sandbags or other erosion control measures shall be <br /> installed to prevent silt runoff to public roadways from <br /> sites with a slope greater than one percent. <br /> • Post a publicly visible sign with the telephone number and <br /> person to contact at the Lead Agency regarding dust <br /> complaints. This person shall respond and take corrective <br /> action within 48 hours. The Air District's phone number <br /> shall also be visible to ensure compliance with applicable <br /> regulations. <br /> Less Than Significant with Mitigation <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page�� <br /> Page 18 of 21 <br /> RESO.#15445 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.