Template:
Agreement
Contractor Name
Scheidt & Bachmann USA, Inc.
PROJECT NAME
Acquisation and installation of Parkinf Access and Revenue Control System (PARCS)
RMP File Number
304
Date
10/1/2015
MO Ref
15-155
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Saw cut new loops, install new loop wire and seal, <br /> 5. Provide, pull and terminate(1) 12 conductor cable, 20 AWG, as per S&B <br /> specification from the ticket acceptor to the barrier gate. <br /> 6. Remove and dispose of all demolished material and cabling. <br /> iii. Automatic Pay Stations <br /> 1. Install eight pay stations at locations to be confirmed by the City. <br /> 2. Use 3 %:X 3�"wedge anchors for the devices. <br /> iv. Office <br /> 1. Install Intercom System <br /> 2. Instal) Facility Server with entervo V2R4 <br /> 3. Install Management Server <br /> 4. Install Credit Card Server <br /> 5. Install and Configure POS(lane and office configurationj <br /> 6. Install/Test Web Cashier <br /> 7. Install&Test CCTV Server&Integration <br /> v. CCTV <br /> 1. Remove existing cameras <br /> 2. Install new cameras and CCTV system <br /> 5. Installation and Start-Up: Contractor shall be responsible for installation of inter-island control <br /> and communication wiring and cabling, Contractor supplied equipment and its' interfacing and <br /> interconnection with City supplied equipment. Contractor shall be responsible for running all <br /> initial diagnostics and system testing pragrams necessary to provide complete working system. <br /> B. City shall: <br /> 1. Provide all external connections as Business CIasS DSL or Tl, if needed. <br /> 2. Provide all credit card processing information in accordance with the schedule. <br /> 3. Provide all configuration information required in accordance with the schedule. <br /> 4. Provide conduit for power, communication or for existing setup, if needed, damaged or <br /> unusable. <br /> 5. Pull new Communication (Cat-5 or Cat-6 if not currently being used) to the local area of the <br /> hardware. <br /> C. City acknowledges: <br /> 1. The gates provided for this system are for use with automobile traffic only. There is inherent <br /> risk when these gates are operated with pedestrian, motorcycle, scooter or bicycle traffic. It is <br /> the City's responsibility to warn its clients of this risk. Contractor will not indemnify nor be <br /> liable for any incidents of injury or damage involving pedestrians, motorcycles, scooters or <br /> bicycles. <br /> 2. There is inherent risk in accepting credit card payments in offline mode. City <br /> understands the system must be monitored in order to minimize the potential loss of <br /> revenue as a result of declined credit cards. <br /> 3.6 INSPECTION OF WORK BY OTHERS <br /> Upon written notice from Contractor that entire work or an agreed portion thereof is complete, City <br /> representative(s) and Contractor shall make final inspection of Work. City and/or City's representative will <br /> then notify Contractor in writing of all particulars in which Work has been found incomplete or defective. <br /> Contractor shall immediately take such measures as are necessary to remedy such deficiencies. <br /> REV:09-10-15 VR <br /> Page 24 of 61 <br /> ATTY/AGR.2015.217/Scheidt& Bachmann USA, Inc. Parking Garage Equipment <br />