Laserfiche WebLink
� <br /> .�, <br /> , ', <br /> SPECIFICATIONS <br /> a. Install split face block planter with bullnose cap, install irrigation or synthetic <br /> plants as shown. <br /> b. Install new walkway the entire frontage of the building from corner to corner. <br /> Walkway to have a 2-foot smooth border with a salted finish inside. Walkway <br /> 10-feet wide as existing. <br /> c. Add ADA ramp on walkway and eliminate step at front of building. <br /> ESTIMATED COST: $55,000 <br /> RENOVATE 800 SF OFFICE SPACE <br /> , ; <br /> � <br /> ATTY/AGR/2015.137/STATE OF CALIFORNIA—MILITARY DEPARTMENT <br /> REV:07-08-15 MLG <br /> Page 26 of 29 <br />