8.B. - Page 17 <br /> capital projects were ranked in the highest priority categories (1 and 2). This means that the flow <br /> model projected potential overflows under existing conditions. Despite this information, the City <br /> has not experienced any overflows as projected by the model in those locations. The City has <br /> been proactively conducting closed-circuit television inspections of the wastewater collection <br /> system to assess the conditions to identify sources of infiltration and inflow into the City's sewer <br /> system. Reductions in infiltration and inflow could reduce the potential overflow conditions and <br /> may also reduce the need for the capital improvements identified in the updated master plan. <br /> The City currently anticipates funding its collection system capital needs on a pay-as-you- <br /> go, cash basis, and has increased its sewer rates accordingly. However, the City might consider <br /> the future use of debt financing if such financing was either needed to fund high-priority projects or <br /> if it made economic sense to construct a number of improvements in a given year rather than <br /> spread the capital improvement expenditures over a longer timeframe. <br /> Additionally, the City could be liable for funding some additional expenditures related to <br /> the monitoring or clean-up of soil with perchloroethylene ("PCE") contamination located under <br /> Sequoia Station, a retail shopping center located next to a Caltrain station. Through mediation, <br /> the City has received approximately $650,000 from the prior owner of a dry-cleaning business that <br /> used to be located near the site and was the source of the PCE. These funds are designated <br /> towards remedying the situation. The San Francisco Bay Area Regional Water Quality Control <br /> Board ("RWQCB") has jurisdiction over determining what actions need to be taken to remedy or <br /> monitor the situation. The RWQCB has determined that the City was partially responsible for the <br /> PCE contamination due to overflow/leaks from the City's sewer pipelines. In July 2014, the City <br /> contracted with an outside consultant to create a work plan that will propose steps to monitor the <br /> groundwater pollutant plume and develop a remedial action plan. In October 2014, the RWQCB <br /> approved the remedial action plan and required the City to submit quarterly groundwater <br /> monitoring reports. As of May 2015, the City has submitted 2 groundwater monitoring reports and <br /> is waiting for direction from the RWQCB regarding whether the proposed strategies (as outlined <br /> within the remedial action plan) can begin. The remedial action plan contains 3 strategies and if <br /> completed, the total estimated cost is $1.4 million. <br /> In addition, the City anticipates financing most of its allocable share of costs for the <br /> Authority's CIP, equal to approximately $253 million over the next five years, after taking into <br /> account proceeds from the 2015 Bonds, the 2014 Bonds, outstanding SRF Loans, an anticipated <br /> $10 million cash contribution from the City, and accounting for a projected 3% annual construction <br /> cost inflation. The City anticipates financing these costs through long-term debt issued by the <br /> Authority and/or the City. <br /> Sewer Utility System Finances <br /> The City's water and sewer utilities are accounted for as separate enterprise funds. Sewer <br /> enterprise operations and capital improvements are funded predominantly by sewer service <br /> charges supplemented by interest earnings, capacity fees, and other miscellaneous revenues. <br />