My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 City of Menlo Park
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 City of Menlo Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2015 9:16:30 AM
Creation date
10/14/2015 9:16:27 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park
PROJECT NAME
Atherrton Channel Maintenance
RMP File Number
304.5
Date
9/18/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br /> Page 4 of 6 <br /> Redwood City shall handle worksite safety and vehicle traffic control if it is required, which shall <br /> comply with all City of Menlo Park standards. Construction operations shall be conducted in <br /> such a manner to cause as little inconvenience to vehicle traffic as possible. <br /> SCHEDULE, WORK DURATION AND HOURS: <br /> The maintenance activities are tentatively scheduled for the month of October 2015, and will be <br /> performed between 6:00 AM to 6:00 PM on Saturdays and Sundays, except when otherwise <br /> specified by Public Works. This work is estimated to be completed in five (5)days. <br /> WORKER ACCESS TO FACILITIES: <br /> The City of Redwood City shall provide access to toilet facilities for its workers. There are no <br /> public facilities near the work site. <br /> POLLUTION CONTROL: <br /> The City of Redwood City shall follow all City of Menlo Park NPDES requirements and Best <br /> Management Practices (e.g., straw or fiber rolls, storm drain filters) to keep miscellaneous litter <br /> and trash out of the Channel and storm drains. The City of Redwood City shall keep the City of <br /> Menlo Park right of way clean of debris, except for areas used for de-watering of spoils. After <br /> removal of de-watered spoils, the City of Redwood City shall leave the area in as clean a <br /> condition as it was before the work. <br /> Attachments: <br /> Attachment A CDFW Draft Streambed Alteration Agreement <br /> Attachment B -Site Plan <br /> 8/28/2015-3:29 PM <br /> ATTY/AGR.2015.212/City of Menlo Park Page 4 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.