My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15458
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2015
>
Res15 15458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2015 4:38:27 PM
Creation date
11/19/2015 8:30:03 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/16/2015 <br /> accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). BMP <br /> plan sheets are available electronically for inserting into project plans. <br /> 81. Prior to removing any public parking spaces from public use during construction, the <br /> applicant shall make this request of the City and pay the applicable fee per Municipal <br /> Code sections 20.175 through 20.183. <br /> 82. The Applicant must prepare a construction traffic hauling and routing plan, subject to <br /> City review and approval in order to minimize construction traffic-related impacts on <br /> adjacent land uses, to ensure that adequate emergency access is maintained during <br /> construction, and to ensure that access to, through and from Downtown Redwood <br /> City is not significantly impacted. <br /> 83. The applicant shall be required to secure adequate parking for any and all <br /> construction trades outside of Downtown Redwood City, unless or until the parking <br /> podium is available on the project site at which time any and all parking associated <br /> with construction trades shall be contained on the project site. Prior to construction, <br /> the Applicant shall submit a Construction Parking Management Plan ("CPMC") to the <br /> City for review. The CPMC shall outline the number of construction workers by <br /> phase, phase duration, and where workers will park for each phase of work. The <br /> CPMC shall prohibit construction parking material storage, equipment, or other <br /> construction-related use within the City right-of-way without prior approval from the <br /> City Engineer. <br /> 84. The applicant shall comply with the following construction-period noise abatement <br /> measures: <br /> • Construction Plan. Prepare a detailed construction plan identifying the <br /> schedule for major noise-generating construction activities. The construction <br /> plan shall identify a procedure for coordination with nearby noise-sensitive <br /> facilities so that construction activities and the event schedule can be <br /> scheduled to minimize noise disturbance. This plan shall be provided to all <br /> noise-sensitive land uses within 500 feet of the construction site. <br /> • Construction Equipment Mufflers and Maintenance. Equip all internal <br /> combustion engine-driven equipment with intake and exhaust mufflers that are <br /> in good condition and appropriate for the equipment. <br /> • Equipment Locations. Locate stationary noise-generating equipment required <br /> on construction project sites as far as possible from sensitive receptors when <br /> sensitive receptors adjoin or are near a construction project site. <br /> • Quiet Equipment Selection. Use quiet construction equipment, particularly air <br /> compressors, wherever feasible. <br /> • Temporary Barriers. Construct solid plywood fences around construction sites <br /> adjacent to residences, operational businesses, or noise-sensitive land uses. <br /> • Temporary Noise Blankets. Temporary noise control blanket barriers should <br /> be erected along building facades of construction sites to attenuate noise from <br /> elevated activities if noise conflicts cannot be resolved by scheduling. (Noise <br /> control blanket barriers can be rented and quickly erected.) <br /> • Noise Disturbance Coordinator. For projects that would last over one year in <br /> duration, the City may choose to require project designation of a "Noise <br /> A1TY/RES0.3157/SA RESO 601 MARSHALL APPEAL 8-STORY PROJECT RESO.#15458 <br /> REV:11-16-15 VR MUFF#603 <br /> Page 18 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.