My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2015-125732 IA 718 Canyon Road_761, 763, 765 Bain Place_IA_11302015
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Improvement Agreement
>
RecDoc 2015-125732 IA 718 Canyon Road_761, 763, 765 Bain Place_IA_11302015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2016 8:15:42 AM
Creation date
11/30/2015 11:54:44 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Improvement Agreement
Doc Num
2015-125732 CONF
Rec Date
11/30/2015
Address
718 Canyon Rd and 761, 763 and 765 Bain Pl
Parties
Ernst Development Corp
MO Ref
15- 159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A GREEMENT <br /> NOW, THEREFORE, in consideration of the faithful performance of the terms and conditions set <br /> forth in this Agreement, the parties hereto agree as follows: <br /> 1 . Purpose. The purpose of this Agreement is to guarantee completion of the Improvements <br /> and ensure satisfactory performance by Developer of Developer's obligations to satisfy the Conditions <br /> pertaining to the Improvements. <br /> 2. Property Subject to Agreement. The Property shall be subject to this Agreement. <br /> 3. Duty to Install Improvements. Developer will construct, install and complete, or cause to <br /> be constructed, installed and completed, at the Developer's sole cost and expense, the Improvements, in <br /> accordance with the Improvement Plans (defined in Recital E. above) and to the satisfaction of the City <br /> Engineer, in his reasonable discretion. Developer will also supply all labor and materials therefor, all in <br /> strict accordance with the terms and conditions of this Agreement. The Improvements shall include, but <br /> are not necessarily limited to, all of the following: <br /> (a) grading, paving <br /> (b) curbs, gutters, concrete walkways, driveways <br /> (c) sanitary sewer system <br /> (d) storm water management and erosion control measures <br /> (e) water system <br /> (f) storm drainage system <br /> (g) site lighting system <br /> (h) street trees <br /> (i) landscaping and irrigation system <br /> (j) utility joint trenching <br /> (k) all Conditions for Tentative Map and conditions of approval for Architectural Permits <br /> for project numbers AP 2012-70, AP 2012-71, AP 2012-72 and AP 2012-73, <br /> heretofore issued for said subdivision, <br /> (1) and all other work, improvements, or construction required by or mentioned in the <br /> abovementioned plans and specifications, conditions of permits and all construction, <br /> appurtenances and improvements necessary as reasonable determined by the City <br /> Engineer to complete the aforementioned improvements, both within and outside of <br /> the abovementioned subdivision. <br /> The construction, installation and completion of the Improvements and all labor and materials furnished <br /> in connection therewith are hereinafter referred to collectively as the "Work." The Work and <br /> Improvements shall be in strict compliance with the provisions of Chapter 30 of the Redwood City Code. <br /> ATTY/AGR/2015.127/ 718 CANYON SUBDIVISION IMPROVEMENT AGREEMENT <br /> REV:06-22-15 VR <br /> Page 2 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.