Laserfiche WebLink
PROJECT SCHEDULE: <br /> Consultant shall complete the work within ninety (90) calendar days after receiving <br /> written authorization from the City Engineer, the Notice to Proceed (NTP). <br /> DELIVERABLES: <br /> Within ninety (90) calendar days after receiving written authorization from the City <br /> Engineer, the Notice to Proceed (NTP), Consultant shall deliver to the City the following: <br /> 1. Electronic files of completed topographic survey base maps for sanitary <br /> sewer Basin 7 in AutoCAD delivered into three (3)sequential phases: <br /> a. Phase 1 — Carolina Avenue, Delaware Avenue and Woodside Road <br /> b. Phase 2 — Kentucky Street, Massachusetts Avenue, Woodside Plaza <br /> Alley, Easement (off Atherwood Avenue and Parkwood Way), <br /> Atherwood Avenue and Wembley Court <br /> c. Phase 3 — Orchard Avenue, Nueva Avenue, Bonita Avenue, Central <br /> Avenue, Murray Court and Carlos Avenue <br /> 2. Two sets of hard copies. <br /> SURVEY PROJECT AREA MAPS: <br /> Consultant shall refer to attached project area maps and the street tabulation with <br /> boundaries as shown in the Request for Proposal for reference. Consultant shall survey <br /> approximately 11,600 linear feet of sewer pipeline which includes the additional extent <br /> of survey beyond the end of manholes and street intersections. <br /> REV:i1-17-15 VR <br /> Page 11 of 14 <br /> ATTY/AGR.2015.253/Sandis-Civil Engineers, Surveyors,Planners <br />