My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-02-22 Closed and Interview and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-02-22 Closed and Interview and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 8:19:52 AM
Creation date
2/18/2016 3:58:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/22/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENVIRONMENTAL REVIEW <br />In June 2002, the City as Lead Agency completed an Initial Study for the “Redwood City <br />Recycled Water Project” in order to comply with the California Environmental Quality <br />Act (CEQA). The report was prepared by CH2MHILL, a consulting firm from San Jose, <br />CA. A Mitigated Negative Declaration (MND) was prepared, filed and approved in 2003. <br />A copy of the report and the MND is available for review at the Community <br />Development Department, Engineering Division. The construction of this pipe segment <br />have been reviewed, analyzed and approved in the 2003 MND. <br /> <br />This project does not require a National Pollutant Discharge Elimination System <br />(NPDES) General Permit for stormwater discharges associated with construction and <br />land disturbance activities pursuant to Attachment A.2 of Order 2010-0014-DWQ which <br />exempts projects to update existing lines and facilities. However, the proposed <br />construction will employ stormwater pollution prevention best methods and practices <br />(NPDES). <br /> <br />Javier Sierra <br />Associate Engineer <br /> <br />Saber Sarwary P.E. <br />City Engineer <br /> <br />Aaron Aknin <br />Assistant City Manager/Community Development Director <br /> <br />ATTACHMENTS <br />1. Project Location Map <br />2. Proposed Recycled Water Distribution System Figure 02 (2014 Report) <br /> <br />RELATED DOCUMENTS IN CITY CLERK’S OFFICE <br />1. Contract Documents <br />2. Bid Documents <br /> <br />6.1.B. - Page 4
The URL can be used to link to this page
Your browser does not support the video tag.