My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Just Leaks
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Just Leaks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2016 10:39:20 AM
Creation date
3/14/2016 10:39:20 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Just Leaks, Inc.
PROJECT NAME
Fire Station # 9 gutter repair
RMP File Number
304.5
Date
3/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> Contractor will perform the following activities to re-surface the gutter system at Fire Station#9, <br /> located at 755 Marshall Street in Redwood City, California: <br /> Task 1 —Completely clean 410 linear feet of gutter. Gutters will be wire brushed, broomed, and <br /> washed completely clean. <br /> Task 2 —Prime the repair area with RustEnders urethane based corrosion converter at the rate of <br /> one gallon per one hundred square feet. Allow the application to cure (usually around 2 hours). <br /> Task 3 — Brush Vulkem 801, a liquid one-part polyurethane coating system, over the entire <br /> project length of the gutter to a 40 wet mil thickness. One ply of six (6) inch stitch bonded <br /> polyester membrane will be worked into the fresh urethane. The membrane will be brushed <br /> firmly into the corners of the seam to ensure good adhesion. <br /> Task 4—Apply a second 40 wet mil application of Vulkem 801 to the 4101inear feet of gutter. <br /> WARRANTY <br /> Contractor wi11 warranty the labor and materials of the outlined repairs for a period of five (5) <br /> years. If any of the Contractor's waterproofing components fail, Contractor will repair them at no <br /> charge to the City. <br /> PAYMENT <br /> For the services described in Exhibit A, the City agrees to pay Contractor a total contract amount <br /> of$26,730.00, which amount shall include all expenses. A progress payment equaling 30% of <br /> the total contract price is due within 3 days of project commencement. The balance on the <br /> project including any addendums shall be due within 3 days of completion. <br /> REV:02-29-16 FF <br /> Page 6 of 6 <br /> ATTY/AGR2016.035/Just Leaks-Fire Station#9 Gutter Repair <br />
The URL can be used to link to this page
Your browser does not support the video tag.