Agmt16 K.J. Woods
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 3:58:28 PM
Creation date
4/5/2016 3:50:44 PM
Metadata
Fields
Template:
Agreement
Contractor Name
K.J.Woods Construction, Inc.
PROJECT NAME
RWC Recycled Water Project Main City Distribution System - Phase 2A Bid Package 10 Hwy 101 Crossing and Walnut St from Maple to Marshall St.
RMP File Number
304
Date
4/5/2016
MO Ref
16-033
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Liquidated Damages <br /> 1 . City and Contractor recognize that time is of the essence of this Agreement <br /> and that City will suffer financial loss in the form of lost revenues, contract <br /> administration expenses (including project management and consultants' <br /> expenses), delay and loss of public use, if the Work is not completed within <br /> the time specified in paragraph III .A. 1 above plus any extensions thereof <br /> allowed in accordance with the Contract Sections. Consistent with Section <br /> 00700 (General Conditions), Contractor and City agree that because of the <br /> nature of the Project, it would be impractical or extremely difficult to fix the <br /> amount of actual damages incurred by City because of a delay in completion <br /> of the Work. <br /> 2. Accordingly, City and Contractor agree that Contractor shall pay City five <br /> thousand and no/100th dollars ($5,000) for each Day that expires after the <br /> time specified in Paragraph III .A. 1 of this Section 00520 for Contractor to <br /> achieve Substantial Completion, until such date as contractor achieves <br /> Substantial Completion. <br /> C. Liquidated damages for delay shall only cover and be in lieu of the actual damages <br /> suffered by City as a result of delay referenced above. Liquidated damages shall not <br /> cover the cost of completion of the Work, damages resulting from defective work, cost <br /> of temporary replacement facilities, damages suffered by others who then seek to <br /> recover their damages from City (for example, delay claims of other contractors or <br /> subcontractors), and defense costs thereof. <br /> IV. CITY'S ENGINEER AND REPRESENTATIVES <br /> Reserved <br /> V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> In order to induce City to enter into this Agreement, Contractor makes the following <br /> representations and warranties: <br /> A. Contractor has visited the Site and has examined thoroughly and understood the <br /> nature and extent of the Work, Site, locality, actual conditions, as built conditions, and <br /> all local conditions and federal, state and local laws and regulations that in any <br /> manner may affect cost, progress, performance or furnishing of Work or which relate <br /> to any aspect of the design and the means, methods, techniques, sequences or <br /> procedures of construction to be employed by Contractor and safety precautions and <br /> programs incident thereto. <br /> B. Contractor has examined thoroughly and understood all reports of exploration and <br /> tests of subsurface conditions, drawings or reports, available for design and <br /> construction purposes, of physical conditions, or which may be apparent at the Site <br /> and accepts the determination set forth in these Sections and Section 00700 (General <br /> Conditions) of the limited extent of the information contained in these Sections upon <br /> which the Contractor may be entitled to rely. Contractor agrees that except for the <br /> information so identified, Contractor does not and shall not rely on any other <br /> information contained in these Sections. <br /> C. Contractor has considered the physical conditions at or contiguous to the Site or <br /> otherwise which may affect the cost, progress, performance or furnishing of Work, as <br /> Contractor considers necessary for the performance or furnishing of Work at the <br /> Contract Sum, within the Contract Time and in accordance with the other terms and <br /> conditions of Contract Sections, including specifically the provisions of the (General <br /> Conditions) . <br />