My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:49:17 AM
Creation date
4/7/2016 5:09:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/11/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTY/AGR/2016.065/BAY AREA PAVING INC. COST SHARED SIDEWALK REPAIR PROJECT <br />REV: 03-31-16 FF <br />Page 6 of 7 <br />EXHIBIT A <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Scope of Work/ Tasks <br />Contractor will provide work in accordance with plans, detail drawings and specifications <br />as detailed below: <br /> Protection of public and private property, utilities, trees, and storm water. <br /> Preparation of sites at various locations throughout the City. <br /> Notification of property owners of upcoming work at their location. <br /> Vehicle and Pedestrian Traffic control. <br /> Demolition of existing sidewalks, driveways, curbs and gutters. <br /> Excavation of base to proper grade. <br /> Removal of all debris (daily). <br /> Placement and compaction of baserock. <br /> Construction of sidewalks, driveways, curbs and gutters, and wheelchair ramps. <br /> Asphalt sawcutting and removal, or grinding, and paving. <br /> Repair of existing irrigation systems. <br /> Installation of PVC drain lines. <br /> Installation of tree grates. <br /> Secure sites at end of each workday. <br /> Clean-up, backfill, finish grading, and site restoration as necessary. <br /> Dust control; and site clean-up. <br /> Tree damage mitigation. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />6.1.C. - Page 9
The URL can be used to link to this page
Your browser does not support the video tag.