My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 SSA Landscape Architects
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 SSA Landscape Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 10:20:52 AM
Creation date
4/18/2016 12:34:51 PM
Metadata
Fields
Template:
Agreement
Contractor Name
SSA Landscape Architects
PROJECT NAME
Red Morton Westside Renovation Project Landscape Architecture seervices
RMP File Number
304
Date
4/13/2016
MO Ref
16-059, 17-162, 18-032, 19-077
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES AND FEE <br />Additional services are required due to the expanded scope of construction for the <br />Magical Bridge Playground and additional support tasks from the original agreement <br />with SSA. <br />Unforeseen existing site conditions such as un -documented electrical lines and utility <br />conflicts, geotechnical inspections and services, the City -furnished aspect of the <br />construction, and the subsequent submittal review and coordination created the need <br />for the expanded scope and fee. This amendment includes the following: <br />Tasks <br />A. Provide Additional Construction Phase Support <br />1. Attend weekly construction meetings <br />2. Sub -consultant coordination <br />3. Submittal review and processing <br />4. Change order review <br />5. Site inspection and observation <br />6. Site Walk and Punch list <br />Total estimated hours: 678 <br />B. Sub -consultants <br />1. Meisti Miller Civil and Structural Engineering <br />a. Submittal review <br />b. <br />RFI responses <br />c. <br />Plan revisions <br />d. <br />Utility coordination <br />2. ENGEO Geotechnical Engineering <br />a. <br />RFI responses <br />b. <br />Site inspections <br />C. <br />Inspection reports <br />3. Aurum Electrical Engineering <br />a. <br />Site observations <br />b. Submittal review <br />C. RFI responses <br />d. Plan revisions <br />e. Change order review <br />f. Punch list and verification walk <br />Reimbursable fees include reproduction, plotting, shipping, and postage and <br />other expenses not included above. <br />REV: 04-17-19 DZ <br />Page 3 of 5 <br />ATTY/AGR.Amend No. 3 /SSA Landscape Architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.