Laserfiche WebLink
• <br /> [[==- 1529 Seaport Boulevard==]] <br /> V. Summary of Inspections and Maintenance: <br /> Summariz .: the following information using the attached Inspection and Maintenance <br /> Checklists: <br /> Identifying Date of Operation and Maintenance Activities Additional Comments <br /> Number of Inspection Performed and Date(s) Conducted <br /> Treatment <br /> Measure <br /> • <br /> - i <br /> VI. Sediment Removal : <br /> Total amount of accumulated sediment removed from the stormwater treatment <br /> measure(s) dur.ng the reporting period: cubic yards. <br /> How was s °diment disposed? <br /> I I Landfill <br /> ether location on-site as described in and allowed by the maintenance <br /> plan <br /> ❑ <br /> other, explain <br /> Page 2 O&M Inspection Report <br /> ATTY/AGR.201 '.004./1529 Seaport - Phase 2 <br />