My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:48:55 AM
Creation date
4/22/2016 3:39:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 3 <br /> Cost Sharing with Redwood City <br /> Total Redwwod City Redwwod City <br /> Percentage Cost <br /> Design $ 57,672.00 40% $ 23,068.80 <br /> Permittign for JARPPA $ 25,799.00 22% $ 5,675.78 <br /> Biological Assesments $ 10,749.00 22% $ 2,364.78 <br /> PCB testing(1) $ 33,738.00 22% $ 7,422.36 <br /> PCB testing(2) $ 23,178.00 22% $ 5,099.16 <br /> Biological monitoring and Inspection $ 33,505.00 22% $ 7,371.10 <br /> _Design Sub total $ 51,001.98 <br /> Constrcution Items <br /> 1 Mobilization $ 20,000.00 22% $ 4,400.00 <br /> 2 Temporary Traffic Control $ 90,000.00 22% $ 19,800.00 <br /> 3 Clearing and Grubbing $ 138,000.00 22% $ 30,360.00 <br /> 4 Site Access/Preparation $ 50,000.00 22% $ 11,000.00 <br /> 5 Channel Excavation& <br /> Embankment $ 221,280.00 22% $ 48,681.60 <br /> 6 Sediment Offhaul&Offsite <br /> Disposal $ 126,255.00 22% $ 27,776.10 <br /> 7 Installation of Temp Gravel Bag I <br /> Dams $ 52,240.00 22% $ 11,492.80 <br /> 8 Bypass Pumping and Diversion <br /> $ 106,000.00 22% ( $ 23,320.00 <br /> 9 Erosion Control $ 60,000.00 22% $ 13,200.00 <br /> 10 Clean(4)48"Culverts @ 101 $ 129,260.00 0% $ - <br /> 11 Clean(2)48:Culverts @ Industrial $ 82,152.00 0% $ - <br /> 12 Clean double 10'x 10'Culvert $ 29,172.00 0% $ - <br /> 13 Geotextile Fabric $ 43,200.00 22% $ 9,504.00 <br /> 14 Seeding&Mulching $ 13,248.00 22% $ 2,914.56 <br /> ICCO#1 I I $149,257.09 22% $ 32,836.56 <br /> $ 1,310,064.09 Constrcution Sub-total $ 235,285.62 <br /> Grand Total $ 286,287.60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.