Laserfiche WebLink
7.B. - Page 19 <br /> US 101 PEDESTRIAN UNDERCROSSING AND <br /> BAIR ISLAND STORM DRAIN PUMP STATION PROJECT <br /> TABLE OF CONTENTS <br /> VOLUME I <br /> Chapter Page <br /> 1 INTRODUCTION 1-1 <br /> 1.1 Project Location 1-1 <br /> 1.2 Project Background 1-1 <br /> 1.3 Purpose and Need 1-3 <br /> 1.4 Project Description 1-4 <br /> 1.5 Project Construction 1-6 <br /> 1.5.1 Construction Access 1-6 <br /> 1.5.2 Construction Activities 1-6 <br /> 1.5.3 Project Schedule 1-8 <br /> 1.5.4 Construction Equipment 1-9 <br /> 1.6 Other Agencies Whose Approval is Required 1-11 <br /> 1.7 List of Preparers 1-11 <br /> 1.8 References 1-12 <br /> 2 ENVIRONMENTAL ANALYSIS 2-1 <br /> 2.1 Aesthetics 2-1 <br /> 2.2 Agriculture and Forestry Resources 2-6 <br /> 2.3 Air Quality 2-7 <br /> 2.4 Biological Resources 2-13 <br /> 2.5 Cultural Resources 2-24 <br /> 2.6 Geology and Soils 2-28 <br /> 2.7 Greenhouse Gas Emissions 2-33 <br /> 2.8 Hazards and Hazardous Materials 2-37 <br /> 2.9 Hydrology and Water Quality 2-41 <br /> 2.10 Land Use and Planning 2-48 <br /> 2.11 Mineral Resources 2-50 <br /> 2.12 Noise 2-51 <br /> 2.13 Population and Housing 2-56 <br /> 2.14 Public Services 2-57 <br /> 2.15 Recreation 2-58 <br /> 2.16 Transportation and Traffic 2-60 <br /> 2.17 Utilities and Service Systems 2-64 <br /> 2.18 Mandatory Findings of Significance 2-67 <br /> US 101 Pedestrian Undercrossing and Bair <br /> Island Storm Drain Pump Station Project <br />