Laserfiche WebLink
7.B. - Page 40 1 Project Description <br /> San Francisco Bay Conservation and Development Commission. San Francisco Bay Scenarios for <br /> Sea Level Rise Maps. Shoreline Areas Potentially Exposed to Sea Level Rise: Central Bay <br /> South. USGS. 2002. <br /> San Francisco Bay Conservation and Development Commission. Sea Level Rise Policies Fact <br /> Sheet. http://www.bcdc.ca.gov/planning/climate_change/SLRfactSheet.shtml. <br /> San Francisco Bay Trail Project. Gap Analysis Study: A Report on Closing the Gaps in the <br /> 500-mile Regional Trail System Encircling San Francisco Bay. September 2005 <br /> Santa Clara Valley Transportation Authority. Transportation Impact Analysis Guidelines. <br /> Congestion Management Program. March 2009. <br /> State Water Resources Control Board. Leaking Underground Storage Tank Database. <br /> GEIMS/Geotracker.Accessed online at: <br /> http://geotracker.waterboards.ca.gov/map/?CMD=runreport&myaddress=333+Main+Stre <br /> et%2C+Redwood+City%2C+CA <br /> United Stated Department of Transportation. Federal Transit Administration. Transit Noise and <br /> Vibration Impact Assessment. May 2006 <br /> United States Fish&Wildlife Service. Region 8 and 9 Habitat Conservation Plans.Accessed online <br /> At: http://ecos.fws.gov/consery plans/public.j sp <br /> WRECO Inc. Bair Island Road US 101 Undercrossing and Pump Station Project. <br /> Draft Limited Environmental Site Assessment. March 2013. <br /> WRECO Inc. Bair Island Road US 101 Undercrossing and Pump Station Project. <br /> Draft Location Hydraulic Study Report. March 2013 <br /> WRECO Inc. Bair Island Road US 101 Undercrossing and Pump Station Project. Draft Water <br /> Quality Report. March 2013. <br /> WRECO Inc. Bair Island Road US 101 Undercrossing and Pump Station Project. <br /> Draft Utilities and Service Systems Impact Report. March 2013 <br /> 1-14 US 101 Pedestrian Undercrossing and <br /> Bair Island Storm Drain Pump Station Project <br />