Laserfiche WebLink
7.B. - Page 78 2 Environmental Analysis <br /> materials into the environment? <br /> c) Emit hazardous emissions or handle ❑ ❑ ❑ <br /> hazardous or acutely hazardous materials, <br /> substances, or waste within one-quarter <br /> mile of an existing or proposed school? <br /> d) Be located on a site which is included on ❑ ❑ ❑ <br /> a list of hazardous materials sites compiled <br /> pursuant to Government Code Section <br /> 65962.5 and,as a result,would it create a <br /> significant hazard to the public or the <br /> environment? <br /> e) For a project located within an airport ❑ ❑ ® ❑ <br /> land use plan or,where such a plan has not <br /> been adopted,within two miles of a public <br /> airport or public use airport,would the <br /> project result in a safety hazard for people <br /> residing or working in the project area? <br /> f) For a project within the vicinity of a ❑ ❑ ❑ <br /> private airstrip,would the project result in <br /> a safety hazard for people residing or <br /> working in the project area? <br /> g) Impair implementation of or physically ❑ ❑ ® ❑ <br /> interfere with an adopted emergency <br /> response plan or emergency evacuation <br /> plan? <br /> h) Expose people or structures to a ❑ ❑ ❑ <br /> significant risk of loss,injury or death <br /> involving wildland fires,including where <br /> wildlands are adjacent to urbanized areas <br /> or where residences are intermixed with <br /> wildlands? <br /> a) Create a significant hazard to the public or the environment through the routine transport, <br /> use, or disposal of hazardous materials? <br /> The proposed project construction would involve the routine use of common hazardous materials, <br /> including vehicle fuels,lubricants, and petroleum products. All petroleum and other hazardous <br /> 2-38 US 101 Pedestrian Undercrossing and Bair <br /> Island Road Storm Drain Pump Station Project <br />