My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:48:55 AM
Creation date
4/22/2016 3:39:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 Environmen 7.B. - Page 105 <br /> XVII. UTILITIES AND SERVICE Potentially Less Than Less Than No <br /> SYSTEMS --Would the project: Significant Significant Significant Impact <br /> Impact with Impact <br /> Mitigation <br /> Incorporation <br /> a) Exceed wastewater treatment ❑ ❑ ® ❑ <br /> requirements of the applicable Regional <br /> Water Quality Control Board? <br /> b) Require or result in the construction of ❑ ❑ ❑ <br /> new water or wastewater treatment <br /> facilities or expansion of existing facilities, <br /> the construction of which could cause <br /> significant environmental effects? <br /> c) Require or result in the construction of ❑ ❑ ® ❑ <br /> new storm water drainage facilities or <br /> expansion of existing facilities,the <br /> construction of which could cause <br /> significant environmental effects? <br /> d) Have sufficient water supplies available ❑ ❑ ❑ <br /> to serve the project from existing <br /> entitlements and resources, or are new or <br /> expanded entitlements needed? <br /> e) Result in a determination by the ❑ ❑ ❑ <br /> wastewater treatment provider which <br /> serves or may serve the project that it has <br /> adequate capacity to serve the project's <br /> projected demand in addition to the <br /> provider's existing commitments? <br /> f) Be served by a landfill with sufficient ❑ ❑ ❑ <br /> permitted capacity to accommodate the <br /> project's solid waste disposal needs? <br /> g) Comply with federal, state, and local ❑ ❑ ® ❑ <br /> statutes and regulations related to solid <br /> waste? <br /> 2-65 US 101 Pedestrian Undercrossing and Bair <br /> Island Road Storm Drain Pump Station Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.