Laserfiche WebLink
2 Environmen 7.B. - Page 105 <br /> XVII. UTILITIES AND SERVICE Potentially Less Than Less Than No <br /> SYSTEMS --Would the project: Significant Significant Significant Impact <br /> Impact with Impact <br /> Mitigation <br /> Incorporation <br /> a) Exceed wastewater treatment ❑ ❑ ® ❑ <br /> requirements of the applicable Regional <br /> Water Quality Control Board? <br /> b) Require or result in the construction of ❑ ❑ ❑ <br /> new water or wastewater treatment <br /> facilities or expansion of existing facilities, <br /> the construction of which could cause <br /> significant environmental effects? <br /> c) Require or result in the construction of ❑ ❑ ® ❑ <br /> new storm water drainage facilities or <br /> expansion of existing facilities,the <br /> construction of which could cause <br /> significant environmental effects? <br /> d) Have sufficient water supplies available ❑ ❑ ❑ <br /> to serve the project from existing <br /> entitlements and resources, or are new or <br /> expanded entitlements needed? <br /> e) Result in a determination by the ❑ ❑ ❑ <br /> wastewater treatment provider which <br /> serves or may serve the project that it has <br /> adequate capacity to serve the project's <br /> projected demand in addition to the <br /> provider's existing commitments? <br /> f) Be served by a landfill with sufficient ❑ ❑ ❑ <br /> permitted capacity to accommodate the <br /> project's solid waste disposal needs? <br /> g) Comply with federal, state, and local ❑ ❑ ® ❑ <br /> statutes and regulations related to solid <br /> waste? <br /> 2-65 US 101 Pedestrian Undercrossing and Bair <br /> Island Road Storm Drain Pump Station Project <br />