Laserfiche WebLink
7.B. - Page 206 <br /> 2 Environmental Analysis <br /> VI. GEOLOGY AND SOILS --Would Potentially Less 'Ilia ti I,e»s Than No <br /> the project: Significant Significant Significant Impact <br /> Impact with Impact <br /> Mitigation <br /> Incorporation <br /> a) Expose people or structures to <br /> potential substantial adverse effects, <br /> including the risk of loss,injury, or death <br /> involving: <br /> i) Rupture of a known earthquake fault, as ❑ ❑ ❑ <br /> delineated on the most recent Alquist- <br /> Priolo Earthquake Fault Zoning Map <br /> issued by the State Geologist for the area <br /> or based on other substantial evidence of <br /> a known fault? Refer to Division of Mines <br /> and Geology Special Publication 42. <br /> ii) Strong seismic ground shaking? ❑ _ ❑ <br /> iii) Seismic-related ground failure, ❑ <br /> including liquefaction? <br /> iv) Landslides? ❑ ❑ ® ❑ <br /> b) Result in substantial soil erosion or the r7.1 ❑ <br /> loss of topsoil? <br /> c)Be located on a geologic unit or soil ❑ Li LJ <br /> that is unstable,or that would become <br /> unstable as a result of the project,and <br /> potentially result in on- or off-site <br /> landslide,lateral spreading, subsidence, <br /> liquefaction or collapse- <br /> d) Be located on expansive soil, as defined ❑ ® LI ❑ <br /> in Table 18-1-B of the Uniform Building <br /> Code (1994),creating substantial risks to <br /> life or property? <br /> e) Have soils incapable of adequately ❑ ❑ <br /> supporting the use of septic tanks or <br /> alternative waste water diFposal syt[e s <br /> 2-29 US 101 Pedestrian Undercrossing and Bair <br /> Island Road Stalin Drain Pump Station Project <br />