Laserfiche WebLink
7.B. - Page 260 <br /> .1„Ligation Ma,itoring and Reporting Plan <br /> Mitigation Measure NOI 6: Enclosure <br /> The Contractor shall select an available sound attenuation enclosure for the emergency generator <br /> that would reduce noise levels to 71 dBA at 50 feet. <br /> Responsible Party: City of Redwood City oversight <br /> -July 15,2013 1-) US 107 Pedestrian Undercrosring and <br /> Bair Island Storrn Water Pump Station Project <br />