Laserfiche WebLink
INITIAL STU I / <br /> MITIGAT P A TIVE DECLARATION <br /> ir Evaluated potential <br /> environmental impacts <br /> Mitigation Monitoring and <br /> Reporting Plan proposed <br /> U.S.HIGHWAY 101 PEDESTRIAN UNDERCROSSING AND BAIR <br /> ISLAND ROAD STORM DRAIN PUMP STATION PROJECT <br /> Public comment period INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION <br /> VOLUME I <br /> August to September 2013 AUGUST 21 2013 Prepa PryofRedwooa:� Pam P Ana vss and VW nc <br /> Air quality, biological QPONr WR6@(J <br /> resources, geology, soils, <br /> hydrology, noise, and more <br /> discussed <br /> Recent public feedback includes: <br /> • Tide levels and flooding, sea level rise, soil disposal <br /> • Project timing, funding <br /> C�ty�i Redwood <br /> 0 <br />