My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Professional Pipe Services
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Professional Pipe Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2016 11:22:57 AM
Creation date
5/2/2016 11:22:56 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Professional Pipe Services
PROJECT NAME
CCTV Inspection of Swewer Lines Basins Nos 5G and DT 2
RMP File Number
304
Date
4/28/2016
MO Ref
16-066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
than one foot per second in the line.While the cleaning nozzle is pulled back,the vacuum system shall be <br /> used to simultaneously remove debris flushed by the cleaning nozzle. <br /> CONTRACTOR shall use a root cutting nozzle to remove all debris.The root cutting nozzle shall revolve <br /> 360 degrees,be capable of cleaning at 6"-48" lines, and operate at 80 gallons per minute at a pressure of <br /> 3,000 pounds per square inch.Dislodged roots shall be captured and removed from the line either by the <br /> vacuum or a basket. <br /> The CONTRACTOR shall remove all sludge,dirt, sand,rocks,roots,grease and other solid or semisolid <br /> material resulting from the cleaning operation at the downstream manhole of the section being cleaned <br /> Procedure for removing roots may include the use af inechanical equipment such �s rodding machines <br /> and bucket machines using root cutters and porcupines. Passing material from manhole section to <br /> manhole section which could cause line stoppages, accumulations of sand in wet wells, or damage <br /> pumping equipment, shall not be permitted. Chemical root treatment shall not be used by the <br /> CONTRACTOR. <br /> Although hazardous materials are not expected, the CONTRACTOR shall contact the City, if such <br /> materials are found. The CONTRACTOR is responsible for proper removal and disposal of any found <br /> hazardous materials. <br /> The CONTRACTOR shall dispose all solids or semisolids resulring from thc cleaning operations from the <br /> site at a suit�bly sairitary landfill site as defined by the Titles 22 and 23 of the California Administrative <br /> Code.Under no circumst�nces will the CONTRACTOR will be allowed to accumulate debris on the site. <br /> The Contr�ctur will be allawed to store s debris container in the City Public Works Services Department <br /> corporation yard.The remov�l and disposal of solids shall be included in the agreed cost. <br /> If the CONTRACTOR encounters a surcharging manhole(flow exceeds the diameter of the sewer pipe), <br /> the CONTRACTOR sh�ll immediately notify the City Public Works Services Department at (650-780- <br /> 7464)and provide information on the cause of the blockage. <br /> The CONTRACTOR shall prevent contract operations from causing�stoppage or ovelflow.In the event <br /> of a stoppage or overflow,the CONTRACTOR shall immediately notify the City Public Works Services <br /> Department at(650-780-7464).The CONTRACTOR shall remove the stoppage and contain and mitigate <br /> the overflow. Overflows shall be mitigated to the City's standards including property damage overflows <br /> that shall require clea.ning and restoration. All costs for damages occasioned by the overflow are the <br /> responsibility of the CONIRACTOR. <br /> All water used in conjunction with the cleaning operations shall be metered and paid for by the <br /> Contractor. 1. Contractor shall pay an�800 deposit to Cash Collecrions �t City Hall, 1017 Middlefield <br /> Road for the construction meter. Monthly service charge will be assessed at the cwrent commercial rate <br /> for a 3"meter which is� 427.32, in addition to the�ctual water usage. The receipt of p�yment shall be <br /> taken to the City's Public Works Services Department, 1400 Broadway, Redwood City, to pick up the <br /> water meter. Prior to final inspection,retum meter to Public Works Services Dtparirnent,who will read <br /> the meter and prepare billing for water usage. Lost or damaged meters will require forfeiture of deposits <br /> plus cost of ineter replacement. <br /> CCTV Inspection <br /> Within 24 hours of cleaning the line, CONTRACTOR shall thoroughly inspect the sewer lines using <br /> CCTV equipment and WinCxn version 8.30.0.2490 inspection softw�re. The CCTV camera and monitor <br /> shall produce a minimum of 460 horizontal lines of resolution. The CG"TV camera shall be a pan-and-tilt <br /> with rotating head capable of providing�360-degree view of the inside of all pipes,connections,and any <br /> REV:03-16-16 VR <br /> Page 7 of!2 <br /> ATTY/AGR.2016.052/Professional Pipe Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.