Laserfiche WebLink
EXHIBIT "A" <br />SCOPE OF SERVICES AND FEE <br />1. Scope of Services <br />Contractor will provide the following work in accordance with plans, detail drawings and <br />specifications: <br />Protection of public and private property, utilities, trees, and storm water. <br />Preparation of sites at various locations throughout the City. <br />Notification of property owners of upcoming work at their location. <br />Vehicle and pedestrian traffic control. <br />Demolition of existing sidewalks, driveways, curbs and gutters. <br />Excavation of base to proper grade. <br />Removal of all debris (daily). <br />Placement and compaction of baserock. <br />Construction of sidewalks, driveways, curbs and gutters, and wheelchair ramps. <br />Asphalt sawcutting and removal, or grinding, and paving. <br />Repair of existing irrigation systems. <br />Installation of PVC drain lines. <br />Installation of tree grates. <br />Secure sites at end of each workday. <br />Clean-up, backfill, finish grading, and site restoration as necessary. <br />Dust control, and site clean-up. <br />Tree damage mitigation. <br />2 Payment Terms <br />Contractor shall provide the services outlined above on a per unit basis not to exceed <br />$396,637.50. Contractor shall invoice City for work performed per the unit schedule as <br />delineated below. <br />ITEM <br />UNIT <br />ITEM <br />UNIT <br />NO. <br />PRICE <br />1 <br />EA <br />Mobilization, demobilization, traffic control, notification and other <br />$517.50 <br />incidentals (Maximum 5% of total base bid, items 1 through 14) <br />2 <br />SF <br />Remove existing concrete sidewalk <br />$5.18 <br />3 <br />SF <br />Construct concrete sidewalk (residential) <br />$9.32 <br />7— <br />SF <br />Remove existing driveway <br />$6.21 <br />5 <br />SF <br />Construct concrete driveway (residential) <br />$10.35 <br />6 <br />SF <br />Construct concrete driveway (commercial) <br />$16.56 <br />7 <br />LF <br />Remove concrete curb and gutter <br />$16.56 <br />8 <br />LF <br />Construct concrete curb and gutter <br />$27.95 <br />9 <br />SF <br />Remove and replace asphalt pavement <br />$10.35 <br />10 <br />SF <br />Remove walkway material <br />$10.35 <br />11 <br />EA <br />Construct wheelchair ramp - Caltran Case C <br />$3,622.00 <br />12 <br />LF <br />Re air irrigation system <br />$25.88 <br />13 <br />CY <br />Additional sub -base excavation <br />$104.00 <br />14 <br />EA <br />Drain line installation <br />$77.63 <br />C <br />REV: 07-11-18 MI <br />Page 3 of 3 <br />ATTY/AGR.Amend No. 2 /Bay Area Paving Inc. -Cost Shared Sidewalk epai <br />