My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Bay Area Paving, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Bay Area Paving, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 12:22:02 PM
Creation date
5/2/2016 11:29:19 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Paving, Inc.
PROJECT NAME
2015-2016 Cost Shared Sidewalk Repair Project
RMP File Number
304
Date
4/28/2016
MO Ref
16-058,
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Pavment Terms. <br /> The fees for services are on a not to exceed basis as delineated below: <br /> TOTAL COST ITEM <br /> Mobilization, demobilization, traffic control, notification <br /> and other incidentals (Maximum 5%of total base bid, <br /> $2,500.00 items 1 throu h 14 <br /> $50,000.00 Remove existin concrete sidewalk <br /> $90,000.00 Construct concrete sidewalk residential <br /> $6,000.00 Remove existin drivewa <br /> $10,000.00 Construct concrete drivewa residential <br /> $8,000.00 Construct concrete drivewa commercial <br /> $40,000.00 Remove concrete curb and utter <br /> $67,500.00 Construct concrete curb and utter <br /> $50,000.00 Remove and re lace as halt avement <br /> $2,500.00 Remove walkwa material <br /> $35,000.00 Construct wheelchair ram -Caltran Case C <br /> $2,500.00 Re air irri ation s stem <br /> $10,000.00 Additional sub-base excavation <br /> $3,750.00 Drain line installation <br /> Total: $377,750.00 <br /> ATTY/AGR/2016.065/BAY AREA PAVING INC.COST SHARED SIDEWALK REPAIR PROJECT <br /> REV:03-31-16 FF <br /> Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.