My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Jesico Zuber Serano
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Jesico Zuber Serano
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2016 2:27:24 PM
Creation date
5/10/2016 2:27:02 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Jesico Zuber Serano
PROJECT NAME
Artistic Services One large wall mural on back of All Star Karate Center at 2636 Broadway part of Perry St / Commercial Way project
RMP File Number
304.5
Date
4/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES, <br /> 1 . The Site. <br /> For purposes of this Agreement, the Site shall refer to one large wall mural on the back of the <br /> All Star Karate Center (2636 Broadway) as part of the Perry Street/Commercial Way Project in <br /> Redwood City, California, depicted in the attached photograph herein in Exhibit A. <br /> 2. Scope of Services. <br /> Artist shall design, organize and apply mural art paint the Work described below upon the Site. <br /> The "Work" is hereinafter referred to as the "Dragon". City shall provide a UV anti-graffiti coating <br /> over the Work within one week of application, weather permitting. <br /> City shall provide all necessary approvals for the installation of the Work, including an <br /> encroachment permit, if necessary, for Artist's use of public rights-of-way for installation of the <br /> Work, at no cost to the Artist. Artist shall not be held responsible for any delay caused by the <br /> actions or failure to act of City's officer's agents or employees. <br /> 3. Compensation. <br /> The total fee for the design and installation of the Work will be not to exceed Twenty Two <br /> Thousand Dollars ($22,000.00). This amount shall constitute full compensation for all services, <br /> materials and fees to be performed or furnished by Artist as described in Section 2, Scope of <br /> Services. <br /> Such payment shall be full compensation for all work performed and services rendered, for all <br /> supervision, labor, supplies, materials, equipment or use thereof, taxes, and for all other <br /> necessary incidentals, including transportation of the Work to the designated site. In the event <br /> the Artist incurs costs in excess of the total price, the Artist shall pay such excess for his/her <br /> own funds, and the City shall not be required to pay any part of such excess, and the Artist shall <br /> have no claim against the City on account thereof. <br /> No payment to the Artist for any work performed or services rendered shall constitute a waiver <br /> or release by the City of any claims, rights, or remedies it may have against the Artist under this <br /> Agreement or by law, nor shall such payment constitute a waiver, remission, or discharge by <br /> the City of any failure or fault of the Artist to satisfactorily perform the Work as required under <br /> this Agreement. <br /> 4. Time of Performance. <br /> Artist shall coordinate commencement, installation, and completion of the Work with the <br /> representative assigned as project coordinator from the City Manager's Office or Parks <br /> Department. The Work shall be in place no later than June 30, 2016, weather permitting. Artist <br /> will immediately notify the City of any delay that occurs or is anticipated in the date of delivery <br /> installation or completion. The completion date for the Work may be extended for a reasonable <br /> amount of time as a result of circumstances and events beyond the control of Artist or upon <br /> written agreement by the Parties. <br /> 5. Approvals. <br /> The Artist shall provide designated representatives of the City the opportunity to review <br /> inspect, and approve the Work's progress at each of the designated times and stages listed <br /> below: <br /> A. Subtle design refinements and/or improvements to the work left to the discretion of the <br /> Artist; and <br /> B. Initial inspection of the Work and/or working drawings immediately after execution of this <br /> Agreement to determine that the Work is in keeping with the Artist representations; and <br /> ATTY/AGR/2016.061/JESICO SERANO AGREEMENT FOR ARTISTIC SERVICES <br /> REV: 03-28-16 FF <br /> Page 6of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.