Laserfiche WebLink
IPS complies. These settings can be configured via the DMS. <br /> d. Should the U.S. Mint change the existing currency in any way the Proposer shall, at its own expense, <br /> update the software to accept the new coins issued as well as the old coins as soon as new coins are <br /> available to the general population. <br /> IPS will comply. <br /> e. The vendor shall be able to alter the coin table to add new coins or to improve screening of invalid <br /> coins upon the City's request. Any changes to the validation process shall be made within ten business <br /> days of written request by the City. <br /> IPS will comply. <br /> 1. The coin validator and coin chute operations shall incorporate no contact points that could be <br /> affected by grime or moisture, or a combination of the two. <br /> IPS complies. <br /> g. The coin validation system shall register both metallic and non-metallic jams. <br /> IPS complies. IPS coin validators and card readers both have sensors that can detect any obstruction, whether <br /> metallic or non-metallic. In either case, any object that obstructs or triggers the sensors will set an alarm, in <br /> which case, the meter will notify the client based on a notification distribution list of the customer's choice. <br /> Such jams will also be displayed in the meter management system until the jam is removed. <br /> 4. Screen <br /> a. Screens shall have a configurable backlight feature. <br /> IPS complies. The M5T"' features a programmable backlit LCD graphical <br /> • <br /> display. <br /> • <br /> b. Date and time shall be displayed on the screen at all times when the Payment Required <br /> meter is "on." <br /> between 9a and Bp <br /> IPS complies. The date and time will be displayed on the meters screen at all F 7 dayslweek <br /> times. Tue OR Jan 2013 09 01 AM <br /> I_ <br /> c. Meter Post ID shall be visible on one of the information screens. <br /> IPS complies. The City can configure the M5TM to display the meter post ID on the screen. <br /> d. Screens shall be able to electronically display: <br /> i. Rates <br /> ii. Days and hours of operation <br /> ill. Tow information <br /> iv. Instructions to the user <br /> IPS complies. IPS meters can support variable and progressive rate structures as demonstrated in the SFpark <br /> project. This project was the first of its kind to incorporate real-time data feeds from parking meters, sensors <br /> and other data sources in order to study the effect of changes in parking rates due to demand and to <br /> implement a dynamic rate structure accordingly. The IPS meters support this complex rate structure through <br /> two types of configurations which are stored in meter memory, including the current active configuration and <br /> one additional future configuration. Each configuration (both current and future) has the ability to provide 7 <br /> Monday- <br /> Total- ate per Hour: $ 2.00 DO NOT PARK o Cards; Use COINS <br /> y Sunday <br /> Total 02 : O Tow until : 12 :00PM 12p313 $3.0/hr <br /> Time: 12a 9a FREE <br /> REV: 05-05-16 JS Press + or - : $ 5.00 9fl2P Tow-Away 3p-7p $2.$0.25/hr <br /> p 53.00/hr 11p-12a 53.00/hr <br /> to change time 3p-7p $2.50/hr <br /> ATTY/AGR.2016.09 Salt 11 :31 AM 7p-12a $0.25/hr m =Max. Stay: 4 hours <br /> Press OK tor more INFO Thu 17 ten 201305 40 Psi <br />