My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Zeiger Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Zeiger Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 10:24:41 AM
Creation date
5/20/2016 10:23:44 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Zeiger Engineers, Inc.
PROJECT NAME
Photometric analysis, construction docs etc street light update Farm Hill area
RMP File Number
304.5
Date
5/19/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Consultant will determine new points of connection for existing streetlights. These new <br /> multiple-circuit connection points for replacement of circuits fed from old series-system <br /> will be coordinated with PG&E. The coordination with PG&E service representative will <br /> include any submission of service request documentation as needed. <br /> City shall provide the best available information as to the current site conditions, and <br /> AutoCAD files of the streets, so that Consultant can prepare an accurate layout for the <br /> new lighting poles. In the event that the City cannot provide that information, Consultant <br /> will scan, digitize, and take field measurements to make an AutoCAD file of the street <br /> plan. <br /> Construction Documents Phase: <br /> Consultant will prepare plans and project specifications in standard CSI or CalTrans <br /> Standard Specifications format. Consultant will submit progress documents at 50% <br /> completion and at 100% completion to City for reviews. Consultant will also submit final <br /> documents to City for review. Consultant will prepare engineer's estimate of <br /> construction costs. <br /> Bidding and Negotiation Phase: <br /> Consultant will attend pre-bid conference and post bid conference as needed. <br /> Construction Phase: <br /> Consultant will review, provide office consultation to answer questions and provide <br /> clarifications to plans and specifications, and site visits during construction as needed. <br /> REV:04-27-16 FF <br /> Page 10 of 11 <br /> ATTY/AGR2016.084/Zeiger Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.