Walnut St and Maple St Sewer Interceptor Improvement Project
RMP File Number
304
Date
5/24/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_.. . ... .._.._ . .... i . . . <br /> 180 Calendar Days from the date the Contract Time commences to run. <br /> B. Liquidated Dama�tes '! <br /> 1. City and Contractor recognize that time is of the essence of this Agreement � <br /> and that City will suffer financiai loss in the form of lost revenues, contract " <br /> administration expenses (including project management and consultants' � <br /> expenses), delay and loss of public use, if the Work is not completed within <br /> the time specified in paragraph III.A.1 above plus any extensions thereof a <br /> allowed in accordance with the Contract documents. Consistent with Section i <br /> 00700 (General Conditions), Contractor and City agree that because of the <br /> nature of the Project, it would be impractical or extremely difficult to fix the I <br /> amount of actual damages incurred by City because of a delay in completion ; <br /> of the Work. ; <br /> 2. Accordingly, City and Contractor agree that Contractor shall pay City$2,500 ; <br /> for each Day that expires after the time specified in Paragraph III.A.1 of this � <br /> Section 00520 for Contractor to achieve Substantial Completion, until such � <br /> date as contractor achieves Substantial Complet(on. ; <br /> C. Liquidated damages for delay shall only cover and be in lieu of the actual damages '; <br /> suffered by Gity as a result of delay referenced above. Liquidated damages shall <br /> not cover the cost of completion of the Work, damages resulting from defective <br /> work, cost of temporary replacement facilities, damages suffered by others who <br /> then seek to recaver their damages from City (for example, delay claims of other � <br /> contractors or subcontractors), and defense costs thereof. ' <br /> � <br /> IV. CITY'S ENGINEER AND REPRESENTATIVES ? <br /> Reserved <br /> V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> In order to induce City to enter into this Agreement, Contractor makes the following <br /> representations and warranties: <br /> A. Contractor has visited the Site and has examined thoroughly and understood the <br /> nature and extent of the Work, Site, locality, actual conditions, as built conditions, <br /> and all Iocal conditions and federal, state and local laws and regulations that in any <br /> manner may affect cost, progress, performance or furnishing of Work or which <br /> relate to any aspect of the design and the means, methods, techniques, sequences <br /> or procedures of construction to be employed by Contractor and safety precautions <br /> and programs incident thereto. j <br /> B. Contractor has examined thoroughly and understood all reports of exploration and <br /> tests of subsurface conditions, drawings or reports, available for design and <br /> construction purposes, of physical conditions, or which may be apparent at the Site <br /> and accepts the determination set forth in these Sections and Section 00700 <br /> (General Conditions) of the limited extent of the information contained in these <br /> Sections upon which the Contractor may be entitled to rely. Contractor agrees that <br /> except for the information so identified, Contractor does not and shall not rely on <br /> any other information contained in these Sections. <br /> Walnut Street and Maple Street Sewer Interceptor Improvement Project 00520-2 <br />