Laserfiche WebLink
I The Port of Redwood City-Tariff No.8 �12�Revised Page 37 COPY <br /> 675 Seaport Boulevazd Cancels <br /> Redwood City,Califomia 94063 �All�Revised Page 37 <br /> Phone: 650 306-4]50 Fax: 650 369-7636 Conection No.�210 <br /> www.redwoodci ort.com Issued:M 25,2016 Effective: u 1,2016 <br /> SECTION V-SERVICE AND FACILITIES <br /> SERVICE AND FACILITTES CHARGE APPLICATION Item No. <br /> 500 <br /> (A) When stevedoring and terminal work aze done by other than the Port of Redwood City,the <br /> Service and Facilities Charge shall be assessed against the stevedore or contractor for the ship's <br /> cazgo handled through the Port's facilities.(See Note 1) <br /> (B) The Service and Faciliries Chazge permits the movement of stevedoring equipment and <br /> personnel onto and around the terminal areas to and from the vessel,provides for the use of <br /> restroom azea,temporary office space on the tezminal and parking area for personnel working <br /> the vessel and cargo and Port security.Full Service and Faciliries Charges will apply once on all <br /> cargo unloaded from a land cazrier and removed by a land carrier at the Port's faciliries.(See <br /> Note 2). <br /> (C) These charges are in addition to all other applicable chazges in this Tariff. <br /> Note 1:No Service and Faciliries charge will be assessed against cargo in containers as defined in <br /> Item 10. <br /> Note 2:For all cargo received inbound,whether by land or ocean carrier at the Port's tank facility at <br /> Berth 5,a single Service and Facilities charge will be assessed only at the tune of the inbound <br /> movement. <br /> SERVICE AND FACILITIES CHARGE Item No. <br /> 501(A) <br /> Rates are based in dollars per 1,000 kilograms,or per cubic meter,according to vessel's manifest, <br /> except as othenvise provided. <br /> ARTICLES RATES <br /> I Cazgo,dry or liquid,N.O.S $ � 3•O8 <br /> Cazgo,dry or liquid,in bulk,viz. <br /> When handled through hopper or ship unloader system $ � 1.G5 <br /> When handled through pipeline between vessel and shore facility $ �5 1.58 <br /> Scrap metal—to vessel over conveyor system $ �-56 2.61 <br /> Scrap metal—N.O.S. �$ �9 2•7 <br /> Issued by: Port of Redwood City, Michael J.Giari, Port Managet <br /> ' � <br /> RESO P-2317 `�;�'���� <br />