My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res 16 P-2317
RedwoodCity
>
City Clerk
>
Resolutions
>
Port Commission
>
2016
>
Res 16 P-2317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2016 12:48:56 PM
Creation date
6/9/2016 12:48:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Port Authority
Date
5/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P �e�ood City-Tariff No.8 410�Revised Page 46 , <br /> 5 aport BoTevard Cancels <br /> Redwood City,Califomia 94063 8Q�Revised Page 46 <br /> Phone: 650 306-4]50 Fax: 650 369-7636 Conection No. �215 <br /> www.redwoodci ort.com Issued:Ma 25,2016 Effective: u 1, 2016 <br /> SECTION VII-MISCELLt1NE0US CHARGES <br /> SORTING CARGO Item No. <br /> 950 <br /> Sorting cazgo on the terminal to specificarions per steamship bill of lading will be charged to the party <br /> requesting this service at the rates in Item 915 for clerks and labor and in Item 925 for any equipment <br /> used. <br /> USE OF SPUR"I'RACK FOR LOADING OR UNLOADING Item 1Vo. <br /> 960(A) <br /> Charges for use of the spur tracks in the Port area will be assessed as follows: <br /> (A) When spur tracks aze used by either a lessee of the Port or a shipper of ocean freight for loading <br /> � or unloading materials on which wharfage will be collected,a charge of$ 65 66.00 per railcar is <br /> assessed for the initia148 hour period or fraction thereof. The initia148 hour period begins upon <br /> azrival of the railcaz onto the spur track. If the initial 48 hour period has elapsed and the railcaz <br /> Iremains on the spur track,an additional charge of$ 44 45.00 for each subsequent 24 hour period <br /> or fraction thereof will be assessed. <br /> I (B) When spur tracks are used under conditions other than stated in(A)above,a chazge of$ �4_ <br /> 121.00 per railcar is assessed per 24 hour period or fracrion thereof.The uutia124 hour period <br /> begins upon arrival of the railcar onto the spur track.If the initia124 hour period has elapsed and <br /> Ithe railcar remains on the spur track,an additional charge of$ �3�.00 for each subsequent <br /> 24 hour period or fracrion thereof will be assessed. <br /> NOTE:The Port assumes no responsibility for loss of or damage to any azticles or cargo so handled <br /> nor is the Port in any way responsible for freight charges,switching or demurrage on said cars. <br /> SUPPLYING FRESH WATER TO VESSELS Item No. <br /> 968(A) <br /> I Between 0800 and 1700,Mondays through Friday,Except Holidays,per request- $ �A4315.00 <br /> � All other hours,per request- $ 4�436.00 <br /> When service is commenced or finished during the hours subject to a higher rate,such higher rate is <br /> applicable for the entire service.The above rates aze for the connection and disconnection of water <br /> hoses and do not include the cost of water. <br /> This space intentionally left blank. <br /> Issued by: Port of Redwood City, Michael J.Giazi, Port Manager <br /> ���� <br /> RESO P-2317 �r< ��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.