My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-06-13 Interview and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-06-13 Interview and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 3:47:23 PM
Creation date
6/9/2016 5:15:41 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/13/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 62 <br /> 2.13 Water Rate Derivation <br /> The basic methodology used to develop new rates is summarized below. <br /> Fixed vs. Variable Rate Recovery <br /> Allocate costs for recovery from fixed <br /> rates vs.variable quantity charges <br /> IP <br /> Fixed Rate Derivation Quantity Rate Derivation <br /> Divide costs allocated for fixed rate Attribute costs allocated for variable <br /> recovery by total meter equivalents to rate recovery to the various customer <br /> determine a uniform cost per 5/8" classes or tiers <br /> meter equivalent <br /> Divide the costs attributed to each <br /> Apply the underlying cost per 5/8" class or tier by projected water use <br /> meter equivalent to larger meter sizes per class or tier to calculate rates <br /> based on meter capacity <br /> B Water Utility Finances& Rates 35 <br /> �'ti Water&Sewer Financial Plans&Rate Studies <br />
The URL can be used to link to this page
Your browser does not support the video tag.