Laserfiche WebLink
the City. These sweeping services shall be billed at an hourly rate. The <br /> City will only pay for total hours swept, and will not pay for any unused <br /> contingency hours. <br /> i. Callback — Whenever, in the opinion of the City, a section of street is <br /> inadequately swept, the Contractor shall, within 24 hours after notification, <br /> re-sweep the section in question and agrees to pay, at the discretion of <br /> the City, liquidated damages of one hundred dollars ($100) for each time a <br /> street is inadequately swept. No additional payment by the City will be <br /> made for callbacks as a result of inadequate sweeping. <br /> j. Weather — In the event of heavy rain or other severe weather conditions, <br /> the scheduled sweeping service may be suspended. The decision to <br /> sweep will be made by the City. The Contractor shall contact the Public <br /> Works Superintendent or Public Works Supervisor to determine if <br /> sweeping has been suspended. <br /> k. Water — City will provide Contractor with water necessary for street <br /> sweeping . Water may be obtained from the potable hydrant located in the <br /> Public Works Corporation Yard. Should the Contractor need to obtain <br /> water from additional hydrants within the City, the Contractor must apply <br /> for a construction meter at City Hall. The Contractor will be responsible <br /> for paying the deposit fee and monthly meter service charges. Contractor <br /> must use a City construction meter to fill from a hydrant within the City. <br /> III . Equipment <br /> The equipment used to complete street sweeping required by this contract is subject <br /> to the approval of the City, and Contractor must be in' possession of equipment <br /> capable of being able to remove a variety of material that can be found on streets <br /> (e.g. leaves, glass, gravel, dirt, mud, etc.) <br /> a. Equipment Breakdowns — Contractor shall properly maintain , at all times, <br /> a fleet of sweeping equipment both as to condition and appearance for the <br /> use on the work under this Agreement. Contractor shall have multiple <br /> spare sweepers on hand in the event of a breakdown by the primary <br /> sweeper. In case of breakdown by the main sweeper, immediate service <br /> within one hour by a second sweeper is required to complete the daily <br /> schedule. If down for more than one hour, Contractor agrees to pay as <br /> liquidated damages of fifty dollars ($50.00) per hour for each hour above <br /> and beyond one hour. <br /> b. Equipment Condition — Contractor's equipment must be in good working <br /> condition , capable of removing dirt, rocks, glass, mud, cans, sticks, <br /> leaves, street debris throughout the life of the contract. The outside body <br /> must be free from dents and large scratches, and paint must be well <br /> maintained. <br /> Page 6 of 34 <br /> REV: 05-30-18 MI <br /> ATTY/AGR.Amend No. 2/Contract Sweeping Services <br />