Laserfiche WebLink
h. Unscheduled Service — Upon City's request, Contractor shall provide <br />unscheduled sweeping of any street(s) or portion(s) of street(s). The City <br />will give Contractor a minimum twenty-four (24) hour notice for <br />unscheduled sweeping. Contractor shall satisfactorily complete any <br />contingency sweeping within two (2) business days after notification from <br />the City. These sweeping services shall be billed at an hourly rate. The <br />City will only pay for total hours swept, and will not pay for any unused <br />contingency hours. <br />i. Callback — Whenever, in the opinion of the City, a section of street is <br />inadequately swept, the Contractor shall, within 24 hours after notification, <br />re -sweep the section in question and agrees to pay, at the discretion of <br />the City, liquidated damages of one hundred dollars ($100) for each time a <br />street is inadequately swept. No additional payment by the City will be <br />made for callbacks as a result of inadequate sweeping. <br />j. Weather — In the event of heavy rain or other severe weather conditions, <br />the scheduled sweeping service may be suspended. The decision to <br />sweep will be made by the City. The Contractor shall contact the Public <br />Works Superintendent or Public Works Supervisor to determine if <br />sweeping has been suspended. <br />k. Water — City will provide Contractor with water necessary for street <br />sweeping. Water may be obtained from the potable hydrant located in the <br />Public Works Corporation Yard. Should the Contractor need to obtain <br />water from additional hydrants within the City, the Contractor must apply <br />for a construction meter at City Hall. The Contractor will be responsible <br />for paying the deposit fee and monthly meter service charges. Contractor <br />must use a City construction meter to fill from a hydrant within the City. <br />III. Equipment <br />The equipment used to complete street sweeping required by this contract is subject <br />to the approval of the City, and Contractor must be in possession of equipment <br />capable of being able to remove a variety of material that can be found on streets <br />(e.g. leaves, glass, gravel, dirt, mud, etc.) <br />a. Equipment Breakdowns — Contractor shall properly maintain, at all times, <br />a fleet of sweeping equipment both as to condition and appearance for the <br />use on the work under this Agreement. Contractor shall have multiple <br />spare sweepers on hand in the event of a breakdown by the primary <br />sweeper. In case of breakdown by the main sweeper, immediate service <br />within one hour by a second sweeper is required to complete the daily <br />schedule. If down for more than one hour, Contractor agrees to pay as <br />liquidated damages fifty dollars ($50.00) per hour for each hour above and <br />beyond one hour. <br />REV: 05-15-19 EI <br />Page 5 of 9 <br />ATTY/AGR.Amend No.3/Contract Sweeping Services - Street Sweeping <br />