Laserfiche WebLink
J:\Eng14\140265\DWG\Exhibits\16_0421 Maintenance Exhibits for RWC\PDF\SWM\APPENDIX C\WORD\F.2-FlowThroughPlanterTemplate.doc Page 1 <br />Flow-Through Planter Maintenance Plan for <br />Design Tech Charter School <br />June 3, 2016 <br />The property contains 2 flow-through planter(s), located as described below and as shown in the <br />attached C6.0 & C6.1 Stormwater Management Plan: <br />§Flow-Through Planter No. 1 is located within DMA-04, northwest of the school. <br />§Flow-Through Planter No. 2 is located within DMA-05, northwest of the school. <br />§Flow-Through Planter No. 3 is located within DMA-06, southwest of the school. <br />§Flow-Through Planter No. 4 is located within DMA-07, north of the school. <br />§Flow-Through Planter No. 5 is located within DMA-09, northeast of the school. <br />§Flow-Through Planter No. 6 is located within DMA-10, south of the school. <br />§Flow-Through Planter No. 7 is located within DMA-11, east of the school. <br />§Flow-Through Planter No. 8 is located within DMA-12, southeast of the school. <br />I.Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into the <br />flow-through planter and landscaping remains attractive in appearance. Table 1 shows the <br />routine maintenance activities, and the frequency at which they will be conducted. <br />Table 1 <br />Routine Maintenance Activities for Flow-Through Planters <br />No.Maintenance Task Frequency of Task <br />1 Evaluate health of trees and groundcover. Remove and replace all dead <br />and diseased vegetation. Treat vegetation using preventative and low-toxic <br />methods. <br />Twice a year <br />2 Maintain vegetation and the irrigation system. Prune and weed to keep flow- <br />through planter neat and orderly in appearance. <br />As needed <br />3 Check that mulch is at appropriate depth (3 inches per soil specifications) <br />and replenish as necessary. <br />Monthly <br />4 Check that soil is at appropriate depth. Till or replace soil as necessary to <br />maintain a minimum of 6 inches between top of mulch and overflow weir. <br />Before wet season and as <br />necessary <br />Vegetated swales are open, shallow channels with <br />Project Address and Cross Streets <br />275 Oracle Parkway, Redwood City, CA 94065 <br />Assessor’s Parcel No.: 095-040-999 <br />Property Owner: Oracle America Inc. <br />Phone No.: <br />Designated Contact: <br />Phone No.: <br />Mailing Address:500 Oracle Parkway 5OP-8 <br />Redwood Shores, CA 94065Flow-through planters are designed to treat and <br />temporarily detain runoff without allowing <br />seepage into the underlying soil. They typically <br />receive runoff via downspouts leading from the <br />roofs of adjacent buildings. <br />ATTY/AGR/2016.160/CENTRUM OWNERS ASSOCIATION - STMMA <br />REV: 06-22-16 JS <br />6.1.K. - Page 70