Laserfiche WebLink
(g) site lighting system, complete <br /> (h) street trees <br /> (i) landscaping and irrigation system complete <br /> (j) utility joint trenching <br /> (k) levee improvements to be designed and constructed in accordance with <br /> FEMA requirements, including but not limited to 44 CFR 65. 10, and sufficiently observed and <br /> documented by Developer to provide supporting documentation to City to assist with future <br /> levee accreditation efforts by City <br /> (1) all Conditions of the Tentative Map <br /> (m) and all other work, improvements, or construction required by or specified <br /> in the Improvement Plans and conditions of permits, including any related construction, <br /> appurtenances and improvements necessary as reasonably determined by the City Engineer to <br /> complete the aforementioned improvements, both within and outside of the Property. <br /> The construction, installation and completion of the Improvements and all labor and <br /> materials furnished in connection therewith are hereinafter referred to collectively as the <br /> "Work." The Work and Improvements shall be in strict compliance with the provisions of <br /> Chapter 30 of the Redwood City Code. In the event a conflict exists between the Improvement <br /> Plans and the requirements of Chapter 30 of the Redwood City Code, the stricter requirement or <br /> standard shall govern, as determined by the City Engineer. <br /> 4. Completion Date. Developer will complete the Work within two years of the <br /> Effective Date. All Work will be completed in a good and workmanlike manner in accordance <br /> with accepted design and construction practices and consistent with the Improvement Plans. <br /> This completion date may be extended by the City Engineer in his or her sole and absolute <br /> discretion at the request of Developer, which request shall be accompanied by a written <br /> assurance acceptable to the City Engineer that the securities required by Section 13 shall remain <br /> enforceable throughout the term of the extension. <br /> 5. Estimated Cost of Work. The engineer's estimated cost of the Work is Two <br /> Million One Hundred Ninety Thousand Three Hundred Eighty-Seven and No/100 Dollars <br /> ($2, 190,387.00) ("Estimated Cost of Work"). <br /> 6. Modifications to the Plans. Approval of this Agreement by City does not release <br /> Developer of its responsibility to correct mistakes, errors or omissions in the Improvement Plans. <br /> If, at any time, in the opinion of the City Engineer, in his reasonable discretion, the Improvement <br /> Plans are deemed inadequate in any respect, Developer agrees to make such modifications, <br /> changes or revisions as necessary in order to complete the Work in a good and workmanlike <br /> manner in accordance with accepted design and construction standards and consistent with the <br /> Conditions and Improvement Plans. <br /> REV: 06-22-16 JS <br /> Page of 15 <br /> ATTY/AGR.2016. 159/Centrum Owners Association - IA <br />