Laserfiche WebLink
FTP #4 Flow-Through Planter North of the school <br /> BA #4 Bioretention Planter Northeast of the school <br /> FTP #5 Flow-Through Planter Northeast of the school <br /> FTP #6 Flow-Through Planter South of the school <br /> FTP #7 Flow-Through Planter East of the school <br /> FTP #8 Flow-Through Planter Southeast of the school <br /> BA #5 Bioretention Planter Southeast of the school <br /> BA #6 Bioretention Planter North of the BCDC parking area <br /> V. Summary of Inspections and Maintenance: <br /> Use the attached Flow-Through Planter and Biorentention Area Inspection and <br /> Maintenance Checklists to conduct inspections monthly (or as needed), identify needed <br /> maintenance, and record maintenance that is conducted <br /> VI. Sediment Removal: <br /> Total amount of accumulated sediment removed from the stormwater treatment <br /> measure(s) during the reporting period: cubic yards. <br /> How was sediment disposed? <br /> ❑ landfill <br /> ❑ other location on-site as described in and allowed by the maintenance <br /> plan <br /> ❑ other, explain <br /> VII. Inspector Information : <br /> The inspections documented in the attached Inspection and Maintenance Checklists were <br /> conducted by the following inspector(s): <br /> Inspector Name and Title Inspector's Employer and Address <br /> Page 2 O&M Inspection Report <br /> ATTY/AGR/2016.160/CENTRUM OWNERS ASSOCIATION - STMMA <br /> REV: 06-22-16 JS <br />