Laserfiche WebLink
07/25/2016 <br />ATTY/RESO.0070/CC RESO DENYING APPEALS & APPROVING PERMIT FOR 603 JEFFERSON RESO. NO. 15515 <br />REV: 07-15-16 VR MUFF NO. 603 <br />Page 11 of 22 <br />d. Work using the public right-of-way for any fixed structure (awnings, roof <br />overhangs, fixed planters, etc.). Insurance, meeting the City’s standards, <br />is required. This permit will be recorded against the property. <br />27. Sewer Capacity – Prior to encroachment permit issuance, submit to the City, <br />and obtain approval of, an evaluation and report prepared by a licensed engineer <br />demonstrating that the existing sewer mains have sufficient capacity for the <br />project. The study shall consider existing, project, other approved projects, and <br />applications currently under review in determining the needed capacity. If the <br />existing sewer main is less than 6” in size, or is in any other way not sufficient as <br />determined by the City Engineer, applicant shall, as part of the Project, construct <br />and install new sewer mains sufficient to meet such requirements, in accordance <br />with the City's Engineering standards and as directed by the City Engineer to the <br />City Engineer's satisfaction. [SDR][ENGINEERING] <br />28. Peak Wet Weather Flow Capacity – Redwood City has exceeded its Peak Wet <br />Weather Flow (PWWF) capacity in the past. A methodology to reduce inflow and <br />infiltration (I/I) by pipe replacement was determined. The applicant shall reduce <br />(I/I) to offset increased sewer demand from the project by replacing aged sewer <br />mains or pay an equivalent in-lieu fee. The length of pipe replacement required <br />or the amount of fee will be based on the project’s sewage generation projection <br />(Attachment L of the City’s Engineering Standards). For parcels within Redwood <br />City but connecting to County owned and maintained sewer, an I/I in-lieu fee may <br />be collected by Redwood City if the County does not require main replacement or <br />collect and in-lieu fee. [COA][ENGINEERING] <br />29. Sewer Lateral Limit – The project is limited to one sewer lateral per parcel. <br />[COA][ENGINEERING] <br />30. Sewer connection – No new lateral connections shall be made to sewer trunk <br />mains. All sewer laterals shall connect to collector mains. [COA] <br />[ENGINEERING] <br /> <br />31. Sewer Lateral Size for Commercial Development - For new or remodeled <br />commercial buildings, sewer laterals less than 4” shall be upgraded to a <br />minimum 6” size. [SDR] [ENGINEERING] <br /> <br />32. Water Mains - Prior to encroachment permit issuance, submit to City, and obtain <br />approval of, an evaluation and report, prepared by a licensed engineer, in <br />conformance with the City's Engineering Standards, demonstrating that the <br />proposed water main meets the domestic and fire flow requirements in <br />accordance with City Code Section 38.26 and the International Fire Code. If the <br />existing water main is less than 6” in size, or is in any other way not sufficient as <br />determined by the City Engineer, applicant shall, as part of the Project, construct <br />and install new water mains sufficient to meet such requirements, in accordance <br />with the City's Engineering Standards and as directed by the City Engineer. <br />New water mains shall be 8” minimum in size and extend across the entire