My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-08 0043 PC Reso 603 Jefferson
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2016
>
Reso PC16-08 0043 PC Reso 603 Jefferson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:22 AM
Creation date
8/24/2016 8:38:51 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
5/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0043/PC RESO 603 JEFFERSON <br />REV: 05-18-16 VR <br />Page 6 of 19 <br />13. Tree Protection - Provide tree protection measures for ordinance-sized trees near <br />the project and show these measures on the building permit plans. [COA][PLANNING] <br />14. Tree Removal Permit - Obtain a Tree Removal Permit for the removal and tree <br />trimming of all ordinance-size trees (number, type and location) defined within the <br />City’s Tree Preservation Ordinance prior to building permit issuance. <br />[SDR][PLANNING] <br />15. Stormwater Runoff - Post-construction runoff into the storm drain shall not exceed <br />pre-construction runoff levels. The applicant’s design professional shall evaluate the <br />project’s impact to the City’s storm drainage system and shall substantiate their <br />conclusions with drainage calculations to the satisfaction of the City Engineer. The <br />project shall be designed in conformance with the Drainage Guidelines <br />for Residential or Commercial Development. [SDR] [ENGINEERING] <br />16. Exterior Lighting – Provide a lighting plan for proposed exterior lighting, including cut <br />sheets, a photometric site plan demonstrating light levels and a diagram showing light <br />spillover. This information shall be included in the building permit plans. New light <br />sources must not introduce glare or light effects that spill off the property. <br />[COA][PLANNING] <br />17. Bicycle Parking – Provide at least 30 bicycle storage spaces, of which 6 spaces are <br />installed on the sidewalk adjacent to building entrances and serve short-term parking <br />needs and 24 serve long-term parking needs. Demonstrate this on the building permit <br />plans. [COA][ENGINEERING] <br />18. Electric Vehicle Charging Stations – Provide for 5 onsite parking spaces equipped <br />with electrical vehicle (EV) charging stations (minimum of 3%) and demonstrate this <br />on the building permit plans. [COA][ENGINEERING] <br />Final Map <br />19. Final Map - Obtain approval and record a Final Map prior to building permit issuance. <br />All final maps shall include the lot configuration and proposed easements and conform <br />to the Subdivision Map Act and Chapter 30 of the Municipal Code. <br />[SDR][ENGINEERING] <br /> <br />20. Agreements - Prior to Final Map approval, enter into the following agreements in a <br />form acceptable to the City Attorney and the Community Development Director: <br />[COA][ENGINEERING] <br /> <br />a. A Landscape Maintenance Agreement for all assigned landscape areas in <br />public rights of way to be maintained. Maintenance items shall include, but are <br />not limited to, planting trees, shrubs, flowers, grass and all appurtenances <br />including irrigation systems and pedestrian scale lighting. <br />b. A Stormwater Treatment Measures Maintenance Agreement for all on-site <br />stormwater treatment measures associated with the project. <br />c. An Improvement Agreement to guarantee the installation of all improvements <br />required of the project and to provide for payment of all City inspection and plan
The URL can be used to link to this page
Your browser does not support the video tag.