My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Golden Bay Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Golden Bay Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 2:56:07 PM
Creation date
9/13/2016 2:56:06 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Golden Bay Construction
PROJECT NAME
Heron Sculpture Outdoor Art Installation
RMP File Number
304.5
Date
9/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� " � a <br /> ���`�"��r e,i-�m. <br /> SECTION 00520 <br /> AGREEMENT <br /> for the <br /> City of Redwood City <br /> HERON SCUI.PTURE OUTDOOR ART INSTALLATIOId <br /> THIS AGREEMENT, made this�day , 20 , by and between <br /> Golden Bay Construction, Inc. whose place of busin is at 3826 De t Road, Haywarcl, CA <br /> s4545 hereinafter called "CONTRACTOR", and the City of Redwood City, a Charter City and <br /> muniapal corporation of the State of Califomia, hereinafter referred to as`CfTY". <br /> In consideration of the mutual cavenar�ts hereinafter set forth, Contractor and City agree <br /> as follows: <br /> i. wowc <br /> A. Contractor shal[ complete all Work specified in the Contract clocuments, in <br /> accordance with the Speafications, Drawings, and all other terms and conditions <br /> of the Contract documerrts. <br /> II. CONTRACT SUqN <br /> A. City shalf pay the Contractor as the "Contract Sum" for completion of Woi-k in <br /> accordance with the Contract documents, as the amount of Thirteen Thousand <br /> Four Hundred Eighty-Six and No/10U Dollars ($13,486.00}, computed in <br /> accordance with Cantractor's Acxepted Proposal dated, August 19, 2018, which <br /> Propo�al is incorporated herein by reference thereto as if fully set forth. <br /> B. The Contract Sum is all i�c{usive and includes all Work; all federai, state, and local <br /> taxes on materials and equipment, and labor fumished by Contractor, its <br /> subcontracta,s, subconsultants, a�itects, engineers, and vendors or otherwise <br /> arising out of Co�rtractor's performanoe of the Wor1c, including any increases in any <br /> such taxes during the term of this Agreemer�t; and any dutles, fees, and royaldes <br /> imposed with respect to any materials and equipmer�t, labor or servic�es. The taxes <br /> cover+ed hereby indude {but are not limited to) occupaational, sales, use, exase, <br /> unemploymer�t, FICA, and income taxes, custams, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whethe� such taxes are <br /> namally included in the prioe of such item or service or are norrnally stated <br /> separately. Nofi+uithstanding the foregoing, each party shaU bear such state or local <br /> inveritory, real property, personal property or �xtures taxes as may be properly <br /> assessed against�by applicab�taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Car�tractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time cflmmenc�s to run as set fotth in Section 0055Q {Notice to <br /> Proceed) and Sec�ion 00700(Genera! Conditions}; and <br /> 1. Contractor shall achieve Substarrtial Completion of the Waic within 30 <br /> Calendar Days from the date the Contract Time commences to run. <br /> AGREEMENT 00520-1 <br /> HERON SCULPTURE OUTDOOR ART 1NSTALLATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.