receipt. Under no circumstances shall Licensee damage, harm, or take any rare, threatened, or
<br /> endangered species present on or about the License Area.
<br /> (1) Cooperation with Public Utilities Commission. Licensee and its Agents shall work
<br /> closely with City personnel to minimize any potential disturbance (even if temporary) of the natural
<br /> features of the License Area and to avoid disruption (even if temporary) of City facilities, in, under, on, or
<br /> about the License Area and City uses of such facilities.
<br /> (g) Heavy Equipment. Licensee shall not use any heavy construction equipment over or
<br /> about City's pipelines, except as otherwise expressly allowed in Section 6(i) (Heavy Equipment and
<br /> Vehicles) below.
<br /> (h) Work Schedule. Licensee must begin installation work, if at all, within ninety (90) days
<br /> after the commencement of the term of this License. At least ten ( 10) business days prior to the
<br /> commencement of any work on the License Area, Licensee shall notify City's Construction Inspector
<br /> ("Construction Inspector"), at (650) 871-3015, of the date such work shall commence and the intended
<br /> construction schedule. Notification must also be given to Underground Service Alert at least two (2) days
<br /> prior to start of work. Notwithstanding the approval of such schedule by SFPUC, the Construction
<br /> Inspector shall have the right to require Licensee to adjust such schedule from time to time. All work
<br /> must be performed during regular working hours (Monday through Friday) between 8:00 a.m. and
<br /> 4:30 p.m., exclusive of City holidays. Any work performed during any other time or day must be
<br /> preapproved by SFPUC at least ten ( 10) business days prior to commencing such work. In connection
<br /> with such approval, City may charge Licensee additional inspection fees payable prior to SFPUC's
<br /> approval of the request. Notwithstanding the work hours set forth above, Licensee shall comply with any
<br /> applicable local ordinance that imposes later start times and/or earlier cessation times for construction
<br /> activities. Licensee shall complete all work and restoration no later than one hundred eighty ( 180) days
<br /> after the commencement of the term of this License, subject to unavoidable delays. For purposes of this
<br /> License, "unavoidable delays" shall mean any delays by reason of acts of God, accidents, breakage,
<br /> strikes, lockouts, other labor disputes, enemy action, civil commotion, protests, riots, demonstrations,
<br /> federal or state governmental restrictions, or by any other reason beyond Licensee's reasonable control.
<br /> Licensee may apply to SFPUC for a one-time extension for a period not to exceed thirty (30) days.
<br /> SFPUC may charge a non-refundable fee of One Thousand Dollars ($ 1,000) to process such application
<br /> for an extension.
<br /> (i) Restoration of License Area. Immediately following completion of any work permitted
<br /> under this License, Licensee shall remove all debris and any excess dirt and shall restore the License Area
<br /> to its condition immediately prior to such work, to City's satisfaction. Licensee shall restore any damage
<br /> caused to existing roads and restore excavated areas with new vegetation (including irrigation and
<br /> maintenance until established) and erosion control netting, all as requested by City, and shall comply with
<br /> all applicable regulations of the regulatory agency with jurisdiction.
<br /> (I) Pipeline Depth/InstaIlation of Above-Ground Markers. Before commencing any
<br /> excavation work in the License Area, Licensee shall measure the depth of City's pipelines, if any, located
<br /> in the License Area by potholing and forward such information to City. Any potholing authorized by this
<br /> License shall be subject to the Construction Inspector's direction. Potholing using of soft dig method
<br /> (vacuum soil extraction system) is preferred. If Licensee wishes to use any other mechanical method
<br /> such as digging with a backhoe, Licensee must submit a request to City in writing at least five (5)
<br /> business days prior to the proposed commencement date and obtain SFPUC's prior written consent,
<br /> which may be issued or withheld at City's sole discretion. Notwithstanding the foregoing, the last two
<br /> feet (2') of soil above the top of any City pipeline must be dug manually, without the use of any
<br /> machines. Upon completion of work, Licensee shall promptly notify City in writing of the depth of
<br /> City's pipeline and related facilities in the License Area. Licensee shall install above-ground markers
<br /> identifying the location of any underground facilities installed pursuant to this License. The location,
<br /> type, and installation of markers and identifying information on the markers shall be subject to SFPUC's
<br /> prior written approval.
<br /> ATTY/AGR20162091/SAN FRANCISCO PUBLIC UTILITIES COMMISSION-REAL ESTATE SERVICES 4 Rev May "016
<br /> REV 09-13-16 sin J
<br /> NMMKTFPS0I1U;aa1RLSlAnalyst FolderUamin\Redwood Citr1P43341h4334 - Revocable License- Redwood City Linden Park St.t MA revisions 6.14.to+RSR inserts 6.20.I6L docx
<br />
|