Laserfiche WebLink
EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> The City of Redwood City systematically replaces aging segments of existing potable <br /> water, and sanitary sewer pipelines as part of the Capital Improvement Program (CIP). <br /> These CIP projects are intended to replace aging pipes that are close to failure, to <br /> increase the size of mains for additional flow and capacity and to improve the overall <br /> systems' performance, service and reliability to the residents and businesses on that <br /> street and surrounding neighborhoods. <br /> This amendment focuses on the preparation for a utilities and street survey that will <br /> provide information related to these prioritized pipelines. The survey will provide the City <br /> with topographic drawings that show the depths and alignments of existing underground <br /> utilities. The survey will also detail the locations of above ground structures. This <br /> information will be utilized during the design stage to determine the depths and <br /> alignments of the proposed utility mains and avoid conflicts with existing utilities during <br /> construction . <br /> This scope of work includes approximately 3.66 and 3. 06 miles of potable water and <br /> sanitary sewer survey lengths, respectively. The budget amendment of $75, 000.00 <br /> breaks down to an additional $50,000. 00 for potable water and $25,000.00 for sanitary <br /> sewer surveys. The survey will cover multiple years (beyond the two year on-call <br /> Agreement) of future CIP Projects. . <br /> The area to be surveyed is itemized and ordered as follows (see also attached map): <br /> Add'I est. Add'I est. <br /> length length <br /> Estimated beyond <br /> beyond <br /> Refer- Start of length of street Estimated <br /> End of street <br /> Street ence Survey Survey (To) pipe (i.e. manholes intersections length of <br /> Map (From) MH to (25 LF from (50 LF from Survey <br /> MH) centerline centerline of <br /> of manhole) street <br /> intersection) <br /> MH # 1730 MH # 567 <br /> Glenwood Sewer - (Start Sta. (Refer to <br /> Ave Basin 1 +00 at location - 50 1 ,816 <br /> 5A centerline of map) 1 ,766 <br /> MH) <br /> MH # 1623 MH # 1704 <br /> Breeze Sewer - (Start Sta. (Refer to <br /> Place Basin 1 +00 at location - 100 575 <br /> 5A centerline of map) 475 <br /> MH) <br /> ATTY/AGR/2017/AMENDMENTS/AMEND NO.1 MACLEOD & ASSOCIATES, INC. <br /> REV: 08-04-17 PR <br /> Page 3 of 11 <br />