Laserfiche WebLink
EXHIBIT A: SCOPE OF WORK INFORMATION <br /> Highway 101 Undercrossing Project: Construction Phase <br /> Sponsoring Agency: City of Redwood City <br /> Contact: Kevin Fehr, Senior Civil Engineer <br /> 650.780.7258 <br /> kfehr @redwoodcity.org <br /> Implementing Agency: City of Redwood City <br /> Contact: Kevin Fehr, Senior Civil Engineer <br /> 650.780.7258 <br /> kfehr@redwoodcity.org <br /> Project Description and Scope of Work: <br /> Construction of a joint-use (bike/ped) path under the U.S. Highway 101 overpass at Redwood <br /> Creek. The proposed path, approximately 700 feet long, will connect a recently-constructed <br /> bicycle path on Bair Island Road to the existing bicycle path on Convention Way. The Project <br /> also extends the pedestrian path to the City-owned parcel south of Convention Way, and includes <br /> a scenic overlook. <br /> Scope of Work Schedule: <br /> Begin End <br /> Preliminary Engineering (PE)/Environmental (ENV) Previous 04/2016 <br /> Final Design (PS&E) 05/2016 09/2016 <br /> Right-of-Way and Utilities 06/2016 06/2017 <br /> Construction 06/2017 01/2018 <br /> Scope of Work Budget/ Source of Funding: <br /> Include funding plan for Scope of Work defined above, including use of TA staff and/or <br /> consultant support if applicable. <br /> Task/Activity Measure A Funding Other Sources* Total <br /> Amount List Fund Source Amount <br /> Construction $500,000 Local funds $1 ,288,325 $1,288,325 <br /> Developer contributions $1 ,211 ,675 $2,500,000 <br /> Total: $500,000 $2,500,000 $3,000,000 <br /> * The other fund sources are provided for informational purposes. <br /> Cash Flow Projection for Measure A Funds only <br /> The cash flow projection is provided for informational purposes only. <br /> San Mateo County Transportation Authority/City of Redwood City <br /> Highway 101 Undercrossing Project 12495786.1 <br /> May 28. 2014 boilerplate <br /> 14 <br /> REV: 08-09-16 VR <br /> ATTY/AGR.2016.210/SMCTA — 101 Undercrossing Measure A grant <br />