Laserfiche WebLink
EXHIBIT A — SCOPE OF SERVICES <br /> 1. DESIGN <br /> 1.1 Design Consulting. At City's request, the "Magical Bridge Team," defined <br /> individually and collectively as the individuals listed in Exhibit E, shall participate in meetings <br /> with City's design team and consultants to assist City in preparing the Final Design and to advise <br /> on all aspects of playground design, including but not limited to equipment selection, site <br /> preparation meetings, criteria for quality control, and methods for making the Red Morton <br /> Playground more inclusive of children with disabilities. City shall retain final decision making <br /> authority over all aspects of the design of the Red Morton Playground. <br /> 1.2 Construction Consulting. The Magical Bridge Team shall advise City throughout <br /> the renovation of the Red Morton Playground on an as needed basis. City shall retain final decision <br /> making authority on all matters relating to the construction, including but not limited to selecting <br /> construction contractors, obtaining permits, and overseeing construction. <br /> 1.3 Access to Playground. City shall provide Magical Bridge, its employees and <br /> agents, with reasonable access to the Red Morton Playground for the purpose of fulfilling its <br /> responsibilities under this Agreement. <br /> 2. FUNDRAISING <br /> 2.1 Fundraising. <br /> a. Fundraising Goal. Magical Bridge shall use commercially reasonable <br /> efforts to solicit a total amount of donations to support the Project not less than the amount of the <br /> Community Donation, as revised by Section 2.1 (b) if applicable. Magical Bridge shall obtain <br /> City's prior written permission for each fundraising event for which it seeks to use City Marks <br /> either at the event or in the promotional material related to that event. <br /> b. Increased Construction Costs. If the successful bid for the construction <br /> contract for the Project exceeds two million eight hundred thousand dollars ($2,800,000), the <br /> Community Donation shall increase by an amount equal to the difference between the amount of <br /> the successful bid and two million eight hundred thousand dollars ($2,800,000) ("Final <br /> Community Donation"). <br /> 2.2 Collection and Holding of Community Donation. <br /> a. Magical Bridge shall maintain its tax exempt 501 (c)(3) status. <br /> b. Magical Bridge will accept and hold donations made towards the Project, <br /> including donations solicited by City, until no later than fifteen (15) days after the Opening Event. <br /> c. Magical Bridge shall provide City with use of its online project and <br /> fundraising page for the purpose of accepting donations for the Project. <br /> ATTY/AGR/2016.252/MAGICAL BRIDGE PLAYGROUND <br /> REV: 09-08-16 MK <br /> Page 15 of 23 <br />